000 01435nam a2200169Ia 4500
999 _c55615
_d55615
008 190209s9999||||xx |||||||||||||| ||und||
082 _aM.Arch TH-0176
_bPAT
100 _aPatil, Ketki (PA102716)
_973744
245 0 _aReconnecting the void back to the city : exploration case of Kotitirth lake and Shahu mill precinct (Also available on CD)
260 _c2018
300 _aa-d,ix,24p.,CD-ROM
505 _aCONTENTS Abstract i Acknowledgements iii Contents v List of tables viii List of figures x List of abbreviations xii 1 Introduction 1 1.1 Public Spaces 1 1.2 Aim 2 1.3 Objective 3 1.4 Need 3 1.5 Scope and Limitations 3 1.6 Methodology 3 1.7 Outcome 3 2 Background and Premise 4 2.1 History and issues on site 5 2.2 Existing Site Condition 5 2.3 Site Analysis 8 3 Programme 11 3.1 Literature Casestudies 11 3.1.1 Dilli Haat, Pritampura 11 3.1.2 Bandra Fort, Mumbai 12 3.2 Programme Formulation 13 4 Design Process 14 4.1 Design Intent 14 4.2 Parcel Allocation and Site Selection 14 4.3 Design Exploration showing key Ideas 15 5 Inferences . 22 References 24 Appendices 25 A1. Appendix title 25
700 _aArya, Meghal (Guide)
_973745
890 _aIndia
891 _a2016 Batch
891 _aFA-PG