000 02918nam a22001697a 4500
999 _c55553
_d55553
082 _aMTM TH-0169
_bLAS
100 _aLashkari, Tulsi (PM001816)
_965016
245 _aInstitutionalizing the command and control centre (Also available on CD)
260 _c2018
300 _axii,72p.,CD-ROM
505 _aCONTENTS Undertaking ii Acknowledgement iii List of figures and tables iv Abbreviations v Executive summary vii Chapter 1: Introduction 1 1.1 Background study 1 1.2 Problem statement 2 1.3 Research topic 3 1.4 Research scope and limitation 3 1.5 Research questions 3 1.6 Research objectives 4 1.7 Research Methodology 4 1.8 Use of this research 5 Chapter 2: Data collection – Literature review 7 2.1 Context 7 2.1.1 What are smart cities? 7 2.1.2 Smart cities around the world 8 2.1.3 Emergence of smart cities in India 9 2.1.3.1 Problem of the cities 9 2.1.3.2 Need for smart cities 10 2.1.3.3 Declaration of the project 11 2.1.3.4 Project selection and implementation 11 2.1.3.5 Project selection and implementation 11 2.1.3.6 Smart city components 12 2.2 Background study of Ahmedabad smart city 13 2.2.1 Smart city components 13 2.3 Introduction to the integrated command and control centre 14 2.3.1 Understanding the terminology 14 2.3.2 Role of command and control centre in smart cities 15 2.3.3 Benefits of the system 16 2.4 Case studies for the best practices 16 2.5 ICCCs in India 20 2.6 Summary of literature review 23 Chapter 3: Data collection - Interviews 25 3.1 Questionnaire for PMCs from other CCCs 25 3.2 Key findings from interviews 25 3.3 Questionnaire for ULB officials in Ahmedabad 26 3.4 Key findings from interviews 27 Chapter 4: Site study and observations 31 4.1 Locational details 31 4.2 Introduction to SASA project 32 4.2.1 Functions and benefits 32 4.2.2 Stakeholders 32 4.2.3 Roles and responsibilities of the stakeholders 33 4.2.4 Introduction to components of SASA project 36 4.2.5 Timeline for the project till inauguration 38 4.3 Key observations 39 Chapter 5: Recommendations 40 5.1 Integral components for institutionalisation 40 5.2 Functional requirements 41 5.2.1 System study of existing ICT service integrations 41 5.2.2 Proposal framework for functional requirement of the system 47 5.3 Technological requirements 63 5.3.1 Security 63 5.3.2 Scalability and flexibility 63 5.3.3 Open standards 64 5.4 Personnel requirements 65 5.4.1 Proposed organogram 65 5.4.2 Recruitment for manpower 67 5.4.3 Training of manpower 68 Chapter 6: Conclusion 70 REFERENCES 71
700 _aDoctor, Gayatri (Guide)
_965017
890 _aIndia
891 _a2016 Batch
891 _aFM-PG
891 _aMaster in Technology Management