000 02318nam a2200181Ia 4500
999 _c55132
_d55132
008 180908s9999||||xx |||||||||||||| ||und||
082 _aCPM TH-0317
_bNAV
100 _aNaveen, C. G. (PT101416)
_962309
245 0 _aRisk Assessment and allocation of PPP metro rail projects in India (Softcopy is also available)
260 _c2018
300 _avii,70p.
505 _aContents Acknowledgements iii Abstract iv List of Figures v List of Tables vi List of Abbreviations vii 1. Introduction 1 1.1. Background 1 1.1.1. Metro Rail System 1 1.1.2. Risks in PPP Projects 2 1.2. Need for Study 4 2. Research Design 5 2.1. Research Objectives 5 2.2. Scope of this Study 5 2.3. Research Methodology 5 2.3.1. Literature Review 5 2.3.2. Data Collection 5 2.3.3. Data Analysis 6 2.4. Research Schedule 6 3. Literature Review 7 3.1. Risk Management in PPP Projects 7 3.2. Need for Risk Allocation 7 3.3. Risk Factor Identification 7 3.4. Risk Factor Categorization 8 3.5. Defintion of Risk Factors 9 3.6. Discussion From Jounrals 11 3.7. Literture Review Table 12 3.8. Learnings from Literature Review 18 3.9. Research Gap 19 4. Methodology 20 4.1. Research Strategy 20 4.2. Identification Phase 20 4.3. Data Collection Phase 21 4.4. Data Analysis Phase 22 5. Data Collection 23 5.1. Questionnaire Survey Design 23 5.1.1. Background of Respondents 23 5.1.2. Section I 23 5.1.3. Section II 23 5.1.4. Section III 23 5.2. Case Study Profile 24 5.2.1. Case Study 1 - Hyderabad Metro Rail - Phase 1 24 5.2.2. Case Study 2 – Mumbai Metro Rail - Line 1 24 5.2.3. Case Study 3 – Gurgaon Rapid Metro Rail – Phase 1 24 5.2.4. Case study 4: Delhi Airport Metro Express Line 25 6. Data Analysis, Results and summary 29 6.1. Respondents Profile 29 6.2. Risk Impact and Significance 30 6.2.1. Analysis and Results 30 6.2.2. Summary 35 6.3. Preferred Risk Allocation 36 6.3.1. Analysis and Results 36 6.3.2. Summary 42 6.4. Actual Rick Allocation of Case Studies 46 6.5. Risk Events in Case Studies 51 7. Conclusion 53 7.1. Conclusion 53 7.2. Limitations 54 7.3. Future Scope 54 8. References 55 Annexure – A 57
700 _aDevkar, Ganesh (Guide)
_953639
890 _aIndia
891 _a2016 Batch
891 _aFT-PG
891 _aConstruction and Planning Management