000 01407nam a2200181Ia 4500
999 _c55130
_d55130
008 180908s9999||||xx |||||||||||||| ||und||
082 _aCPM TH-0315
_bPRA
100 _aPratap, Mayuresh (PT101216)
_962314
245 0 _aStudy of cost factor that affect a construction project (Softcopy is also available)
260 _c2018
300 _avi,91p.
505 _aContents Acknowledgements iii Abstract iv List of figures v List of tables vi 1. Introduction 1 2. Need for study 3 3. Objective 5 4. Scope of study 5 5. Research methodolgy 6 5.1. Literature review 6 5.2. Data collection & analysis 6 6. Literature review 7 6.1. Introduction 7 6.2. Review 7 7. Interview Question 27 8. Thesis Schedule 29 9. Data Collection & Analysis 31 9.1. Introduction 31 9.2. Quantitative Data Collection & Analysis 31 9.2.1.Data Collection for Quantitative Analysis 31 9.2.2.Quantitative Data Analysis 32 9.2.3.Validity and reliability of questionnaire survey 38 9.3. Qualitative data collection & analysis 47 9.3.1.Qualitative data collection 47 9.3.2.Qualitative data analysis 48 9.4. Result Summary 49 9.5. Comparison with previous study 52 10. Conclusion 53 11. Future Scope 54 References 55 Annexures A 56 Annexures B 64
700 _aSanghvi, Amar (Guide)
_962315
890 _aIndia
891 _a2016 Batch
891 _aFT-PG
891 _aConstruction and Planning Management