000 | 01407nam a2200181Ia 4500 | ||
---|---|---|---|
999 |
_c55130 _d55130 |
||
008 | 180908s9999||||xx |||||||||||||| ||und|| | ||
082 |
_aCPM TH-0315 _bPRA |
||
100 |
_aPratap, Mayuresh (PT101216) _962314 |
||
245 | 0 | _aStudy of cost factor that affect a construction project (Softcopy is also available) | |
260 | _c2018 | ||
300 | _avi,91p. | ||
505 | _aContents Acknowledgements iii Abstract iv List of figures v List of tables vi 1. Introduction 1 2. Need for study 3 3. Objective 5 4. Scope of study 5 5. Research methodolgy 6 5.1. Literature review 6 5.2. Data collection & analysis 6 6. Literature review 7 6.1. Introduction 7 6.2. Review 7 7. Interview Question 27 8. Thesis Schedule 29 9. Data Collection & Analysis 31 9.1. Introduction 31 9.2. Quantitative Data Collection & Analysis 31 9.2.1.Data Collection for Quantitative Analysis 31 9.2.2.Quantitative Data Analysis 32 9.2.3.Validity and reliability of questionnaire survey 38 9.3. Qualitative data collection & analysis 47 9.3.1.Qualitative data collection 47 9.3.2.Qualitative data analysis 48 9.4. Result Summary 49 9.5. Comparison with previous study 52 10. Conclusion 53 11. Future Scope 54 References 55 Annexures A 56 Annexures B 64 | ||
700 |
_aSanghvi, Amar (Guide) _962315 |
||
890 | _aIndia | ||
891 | _a2016 Batch | ||
891 | _aFT-PG | ||
891 | _aConstruction and Planning Management |