000 02420nam a2200181Ia 4500
999 _c55121
_d55121
008 180908s9999||||xx |||||||||||||| ||und||
082 _aCPM TH-0306
_bBHA
100 _aBhatia, Husain (PT100316)
_962326
245 0 _aAnalysis of waste in design process of indian building projects (Softcopy is also available)
260 _c2018
300 _avi,102p.,4sheets
505 _aContents Acknowledgement iii Abstract iv List of Figures v List of Tables vi List of Abbreviations vii 1. Introduction 1 1.1 Work Outline 1 1.2 Need of Study 2 2. Research Design 3 2.1 Objective of Study 3 2.2 Scope of Study 3 2.3 Preliminary Literature Review 3 2.3.1 Lean Thinking 3 2.3.2 Lean Construction 3 2.3.3 Lean Design 4 2.4 Research Methodology 4 2.5 Preliminary Study Outcome 5 2.6 Thesis Schedule 5 3. Literature Review 7 3.1 Traditional Design Process 7 3.2 Lean Production System 7 3.3 Lean Design 9 3.4 Waste 10 3.5 Waste Drivers 11 3.6 Literature Review Table 20 3.7 Research Gap 26 4. Data Collection and Analysis 27 4.1 Case 1: Design Process of Commercial Building 30 4.1.1 Steps of Design process with Relationships 30 4.1.2 Identification of Value Adding, Non-Value Adding and Non-Value Adding but Necessary Activities 36 4.1.3 Value Stream Map 42 4.2 Case 2: Design Process of a Hospital Building 46 4.2.1 Steps of Design process with Relationships 46 4.2.2 Identification of Value Adding, Non-Value Adding and Non-Value Adding but Necessary Activities 49 4.2.3 Value Stream Map 53 4.3 Case 3: Design Process of Residential Building 56 4.3.1 Steps of Design process with Relationships 56 4.3.2 Identification of Value Adding, Non-Value Adding and Non-Value Adding but Necessary Activities 59 4.3.3 Value Stream Map 62 4.4 Case 4: Design Process of Hotel 65 4.4.1 Steps of Design process with Relationships 65 4.4.2 Identification of Value Adding, Non-Value Adding and Non-Value Adding but Necessary Activities 68 4.4.3 Value Stream Map 72 4.5 Comparison of Durations 75 4.6 Questionnaire Survey 76 5. Result and Discussion 79 5.1 Questionnaire Data Analysis 79 5.2 Summary of Wastes 87 5.3 Suggestions 87 5.4 Summary of findings 89 6. Conclusion 90 7.1 Future Research 90 7. References 92 Annexure 94
700 _aDevkar, Ganesh (Guide)
_953639
890 _aIndia
891 _a2016 Batch
891 _aFT-PG
891 _aConstruction and Planning Management