000 01635nam a2200181Ia 4500
999 _c55089
_d55089
008 180908s9999||||xx |||||||||||||| ||und||
082 _aSD TH-0237
_bPAN
100 _aPandey, Karan (PT401116)
_962670
245 0 _aDesign of bridge sub-structure and foundation system of a high level bridge across orsang river at Dabhoi-Tilkwada road (Softcopy is also available)
260 _c2018
300 _axi,182p.,4sheets
505 _a Table of Contents Declaration I Acknowledgement III Abstract IV Table of Contents V List of Tables VII List of Figures VII Abbreviations IX 1 INTRODUCTION 1 1.1 General 1 1.2 Super-Structure 1 1.3 Sub-Structure 2 1.4 Foundation System 3 1.5 Project Details 3 1.6 Objectives 5 1.7 Scope of Work 5 2 LITERATURE REVIEW 7 3 DETAILED METHODOLOGY 9 3.1 Hydraulic Study 9 3.2 Bearing Layout 13 3.3 Design Methodology 15 3.4 Limit State Design 15 3.4.1 Ultimate Limit State 15 3.4.2 Limit State of Serviceability 22 4 ANALYSIS AND DESIGN 25 4.1 General 25 4.2 Types of Loading 25 4.3 Analysis and Design of Pier Cap 34 4.4 Analysis and Design for Pier 37 4.5 Analysis & Design of Pile Cap 41 4.6 Analysis & Design of Pile 43 4.7 Analysis in STAAD Pro Software 45 5 RESULTS & OBSERVATIONS 47 5.1 Forces in Wall Type & Circular Pier 47 5.2 Design of Wall Type & Circular Pier 49 5.3 Design of Pile 50 6 Conclusion 53 REFERENCES 55 ANNEXURE 57
700 _aPatel, Devang (Guide)
_962176
890 _aIndia
891 _a2016 Batch
891 _aFT-PG
891 _aStructural Design