000 | 02523nam a2200169Ia 4500 | ||
---|---|---|---|
999 |
_c55032 _d55032 |
||
008 | 180908s9999||||xx |||||||||||||| ||und|| | ||
082 |
_aM.Arch TH-0130 _bJAI |
||
100 |
_aJaiswal, Esha (PA101016) _962883 |
||
245 | 0 | _aKnowledge resource centre : place making at Malek Saban lake, Ahmedabad (Also available on CD) | |
260 | _c2018 | ||
300 | _a89,8sheets,CD-ROM | ||
505 | _aCONTENTS Abstract 9 Acknowledgements 11 Contents 13 List of tables 15 List of figures 17 List of abbreviations 19 List of drawings 21 1 Introduction 23 1.1 About Malek Saban Lake 23 1.2 Aim 23 1.3 Objectives 23 1.4 Scope & Limitations 23 1.4.1 Intellectual Scope 23 1.4.2 Geographical Scope 24 1.4.3 Temporal Scope 24 1.4.4 Limitation 24 1.5 Methodology 24 1.6 Outcome 24 2 Background and Premise 25 Site Location 25 2.1 Existing Condition of Malek Saban Lake 27 2.2 History and issues on site 28 2.3 Site in Landuse and Development Plan (DP) 31 3 Programme 37 3.1 Programme Formulation 37 3.1.1 SWOT Analysis 37 3.1.2 Parcel Allocation 37 3.1.3 Premise for programme 41 3.1.4 Site Survey . 42 3.1.5 Programme Case Studies . 44 3.1.5.1 Ahmedabad Management Association (AMA), Ahmedabad 44 3.1.5.2 Knowledge Consortium of Gujarat (KCG), Ahmedabad 46 3.2 Programme: Knowledge Resource Centre 47 3.2.1 Vision for programme: 48 3.2.2 Brief of Project 49 3.2.2.1 General School 49 3.2.2.2 Training Centre 50 3.2.2.3 Entrepreneurship Centre 50 3.2.3 Programme Details 51 4 Design Process 53 4.1 Design Intent 53 4.2 Parcel allocation and site selection 53 4.3 Site context and study 59 4.4 Design process showing key ideas 61 5 Design Proposal 85 References 87 Appendices 89 A1. Why is Malek Saban Lake not being used? 90 | ||
700 |
_aBhatt, Purvi (Guide) _93496 |
||
890 | _aIndia | ||
891 | _a2016 Batch | ||
891 | _aFA-PG |