000 02278nam a2200181Ia 4500
999 _c54889
_d54889
008 180822s9999||||xx |||||||||||||| ||und||
082 _aB TH-0753
_bPAT
100 _aPatel, Vyoma (UC3913)
_961487
245 0 _aIdentifying value enhancing factors and applicability of visual management tools (Also available on CD)
260 _c2018
300 _axxi,69p.,CD-ROM
505 _aCONTENTS Introduction 1 Chapter outline 1 Background 1 Research motivation 2 Research outline 3 Aim 3 Objective 3 Scope 3 Research Question 4 Hypothesis 4 Outcome 4 Research timeline 4 Literature review 7 Chapter Outline 7 Understanding the value in construction 7 Lean theory and Lean construction 10 Lean Construction 11 2.4.1 Lean Construction tenants 12 Visual Management 13 History of lean visual management 13 Definition of visual management 14 List of visual tools 14 Advantages of visual management 16 Research Methodology 17 Chapter outline 17 Research Methodology background 17 Research model 18 3.3.1 Research Onion and its layers 18 Summary 22 Research Plan 22 Data Collection 25 Overview 25 Method selection for collecting data 25 Data collection for defining value perception 26 Data collection for determining factors 27 Data collection for ‘factor vs. VM tools’ matrix 28 Mode of administration & respondents 29 Designing data collection medium 30 Data collection methodology summary 31 Outcome of data collection 32 Estimated and collected samples 32 Data reliability check 33 Data based on unit of analysis 34 Data Analysis & Inferences 37 Chapter overview 37 Data analysis process 37 Quantitative analysis for factors 37 Qualitative content analysis for value perception 38 Analysing the matrix 38 Result discussion and inferences 39 Perception of value construction industry 46 Matrix Analysis 48 Conclusion 51 Limitations 52 Future scope 52 References 54 Appendices 57 Appendix 1: Research philosophy table 58 Appendix 2: Comments by experts in pilot survey 59 Appendix 3: Final design of data collection medium 61 Appendix 4: Reliability check 62
700 _aKaria, Nimitt (Guide)
_962251
700 _aPandit, Devanshu (Guide)
_962252
890 _aIndia
891 _a2013 Batch
891 _aFT-UG