000 | 02409nam a2200169Ia 4500 | ||
---|---|---|---|
999 |
_c54871 _d54871 |
||
008 | 180822s9999||||xx |||||||||||||| ||und|| | ||
082 |
_aB TH-0735 _bJOS |
||
100 |
_aJoshi, Padmadip (UC1713) _961383 |
||
245 | 0 | _aDesign management for EPC contract (Also available on CD) | |
260 | _c2018 | ||
300 | _aii,5,iv,60p.,CD-ROM | ||
505 | _aCONTENTS Chapter 1: Introduction 7 1.1 Introduction 7 1.2 Need 7 1.3 Objective of Study 7 1.4 Scope of Study 8 1.5 Research Methodology 8 1.5.1 Literature Review 8 1.5.2 Data Collection 8 1.5.3 Data Analysis 9 1.6 Research Schedule 9 1.7 Limitations of Study 9 Chapter 2: Literature Review 10 2.1 Introduction to EPC Project 10 2.2 Design 10 2.2.1 Design Scope 11 2.2.2 Design Standards and Specifications 12 2.2.3 Design Approval Process 12 2.2.4 Design Review Process 13 2.2.5 Design Responsibilities 13 2.2.6 As-Built Drawing Submission 13 2.3 Design Management 13 2.3.1 Design Risk Management 14 2.3.2 Design Restrictions 14 2.3.3 Design Failure 14 2.3.4 Design and Construction Integration 14 2.3.5 Design Changes 14 2.3.6 Design Control 15 2.4 Project Work Scope 15 2.4.1 Planning Process 15 2.4.2 Scope Requirement 16 2.4.3 Design Planning 16 2.5 Contractor’s Relation With Project Participants 17 Chapter 3: Data Collection and Findings 18 3.1 Overview 18 3.2 Criteria for Selection of Case Studies 18 3.3 Methodology of Data Collection 19 3.3.1 Primary Data 20 3.3.2 Secondary Data 21 3.4 Case Study Details 21 3.4.1 Scope of Project Participants 21 3.4.2 Case Study 1 21 3.4.3 Case Study 2 25 3.4.4 Case Study 3 28 3.5 Scope of Design Consultant 33 3.6 Design Approval Process 34 Chapter 4: Data Analysis 37 4.1 Methodology 37 4.2 Similarity Variation Analysis 37 4.3 Relative Importance Index 39 4.3.1 Checks 39 4.3.2 RII - Reasons for Design Delays 41 4.4 Drawing Control Index 42 4.4.1 Method to analyse drawing control index 42 4.5 Findings from Questionnaire Survey 44 Chapter 5: Conclusion 45 5.1 Findings from Case Studies 45 5.2 Findings from Questionnaire Survey 46 Chapter 6: Suggestions 47 6.1 Contractor’s Relation with Project Participants 47 6.2 Future Scope of Study 48 References 49 Annexures 51 Annexure 1: Questionnaire Survey 51 Annexure 2: Opinion Survey 60 | ||
700 |
_aShah, Reshma (Guide) _962261 |
||
890 | _aIndia | ||
891 | _a2013 Batch | ||
891 | _aFT-UG |