000 01910nam a2200169Ia 4500
999 _c54866
_d54866
008 180822s9999||||xx |||||||||||||| ||und||
082 _aB TH-0730
_bDAV
100 _aDave, Chinmyee (UC1013)
_961375
245 0 _aStudy of purchase system with proposal of model (Also available on CD)
260 _c2018
300 _ax,a-j,53p.,CD-ROM
505 _aCONTENTS CHAPTER 1. INTRODUCTION 1.1 OVERVIEW 1.2 NEED 1.3 OBJECTIVE 1.4 SCOPE 1.5 LIMITATIONS 1.6 METHODOLOGY 1.7 EXPECTED OUTCOME 1.8 TIME SCHEDULE CHAPTER 2. LITERATURE STUDY 2.1 INTRODUCTION 2.2 MATERIAL MANAGEMENT 2.3 PURCHASE MANAGEMENT 2.3.1 PURCHASING STRUCTURE 2.3.2 PURCHASE SYSTEM 2.4 GLOBAL SOURCING 2.5 PARTNERSHIP RELATIONSHIP 2.6 PARAMETERS AFFECTING PROCUREMENT 2.7 IMPACT OF PURCHASE MANAGEMENT ON EFFICENCY & PROFITABILITY 2.8 MATERIALS PLANNING AND CONTROL 2.9 VENDOR INQUIRY AND EVALUATION 2.10 WAREHOUSING, RECEIVING AND MATERIAL DISTRIBUTION 2.11 PURCHASE POLICY CHAPTER 3. DATA COLLECTION 3.1 METHODOLOGY OF DATA COLLECTION 3.2 SAMPLE DETAIL 3.2.1 PRIMARY DATA SAMPLE 3.2.2 SECONDARY DATA SAMPLE DETAIL 3.3 DATA COLLECTION 3.3.1 PRIMARY DATA 3.3.2 SECONDARY DATA CHAPTER 4. DATA ANALYSIS 4.1 PRILIMINARY SURVEY 4.2 SECONDARY DATA ANALYSIS 4.3 PROPOSED MODEL 4.3.1 INTRODUCTION 4.3.2 INDENTING PROCESS 4.3.3 VENDOR REGISTRATION AND SELECTION 4.3.4 DEPARTMENTS INVOLVED 4.3.5 TERMS AND CONDITION 4.3.6 MATERIAL QUALITY CONTROL 4.3.7 INVENTORY CONTROL 4.3.8 PAYMENT PROCESS 4.3.9 APPROVALS 4.3.10 FORMATS CHAPTER 5. CONCLUSION 5.1 CONCLUSION CHAPTER 6. RECOMMENDATION 6.1 RECOMMENDATION 6.2 FUTURE SCOPE CHAPTER 7. ANNEXURE 7.1 PRILIMINARY DATA COLLECTION QUESTIONNAIRE 7.2 SECONDARY DATA INTERVIEW QUESTIONS CHAPTER 8. REFERNECES
700 _aDave, Manish (Guide)
_961495
890 _aIndia
891 _a2013 Batch
891 _aFT-UG