000 01714nam a2200169Ia 4500
999 _c54861
_d54861
008 180822s9999||||xx |||||||||||||| ||und||
082 _aB TH-0725
_bBHA
100 _aBhatt, Reddhi (UC0313)
_961356
245 0 _aRisk assessment for metro rail projects (Softcopy is also available)
260 _c2018
300 _aii,6,I,79p.
505 _aCONTENTS Acknowledgement 1 Abbreviations 7 Chapter 1 Introduction 8 1.1 Overview 8 1.2 Background 8 1.3 Need for study 8 1.4 Objectives 9 1.5 Scope 9 1.5.1 Selection of case study 9 1.6 Methodology 10 1.6.1 Literature study 10 1.6.2 Data collection 10 1.6.3 Data analysis 11 1.6.4 Inferences 11 1.6.5 Conclusion and Recommendations 11 1.6.6 Limitations 11 1.6.7 Work Plan 11 Chapter 2 Literature Study 12 2.1 Risk Assessment 12 2.2 Procedure for risk assessment 12 2.2.1 Classification for each construction phase. 13 Chapter 3 Data Collection 16 3.01 Overview 16 3.02 Selection criteria for the case studies 16 3.03 Data Collection 17 3.03.01 Primary Data collection 17 3.04 Secondary Data 19 3.04.01 Case studies 20 3.04.02 Mumbai Metro 25 3.05 Mitigation measures 29 Chapter 4 Data Analysis 35 4.01 Overview 35 4.02 Data analysis method 35 4.02.01 Comparison of risk factors and interpretation as per construction method 39 4.04 Comparison of the respondent survey with the literature and case studies. 41 Chapter 5 Conclusion 43 5.01 Overview 43 5.02 Findings from questionnaire with case studies 43 Chapter 6 Recommendations 45 Annexure A 47 Annexure B 57 Annexure C 58 Annexure D 62 Annexure E 63 References 79
700 _aShah, Reshma (Guide)
_962268
890 _aIndia
891 _a2013 Batch
891 _aFT-UG