000 | 00650nam a2200157Ia 4500 | ||
---|---|---|---|
008 | 180516s9999||||xx |||||||||||||| ||und|| | ||
082 |
_aB TH-0720 _bCHA |
||
100 | _aChavda, Devang | ||
245 | 0 | _aResource optimisation of precast yard of metro rail projects | |
260 | _c2017 | ||
300 | _avii,49,vp. | ||
505 | _aCONTENTS CHAPTER 1. INTRODUCTION 1 1.1 Background of the Study 1 1.2 Need for study . 1 1.3 Research Objective 2 1.4 Scope of study . 2 1.5 Limitation of study . 2 1.6 Research Signific | ||
700 | _aPandit, Devanshu (Guide) | ||
891 | _a2010 Batch | ||
891 | _aFT-UG | ||
999 |
_c52747 _d52747 |