000 00673nam a2200157Ia 4500
008 180516s9999||||xx |||||||||||||| ||und||
082 _aB TH-0685
_bPAT
100 _a Patel , Aniket
245 0 _aStudy of time and cost overruns on highrise building projects (Also available on CD)
260 _c2017
300 _axiii,44p.CD-ROM
505 _aCONTENTS CONTENTSI LIST OF FIGURES III LIST OF TABLES IV ACKNOWLEDGEMENT V PREFACE VI ABSTRACT VII LIST OF ABBREVIATIONS VIII 1. INTRODUCTION 1 1.1 BACKGROUND 1 1.2 NEED OF STUDY 1 1.3 OBJECTIVES OF STUDY 1 1.4 SCOPE OF STUDY 1 1.5 LIMITATION
700 _aDeshmukh, Sagar (Guide)
891 _a2012 Batch
891 _aFT-UG
999 _c52712
_d52712