000 | 00656nam a2200157Ia 4500 | ||
---|---|---|---|
008 | 180516s9999||||xx |||||||||||||| ||und|| | ||
082 |
_aB TH-0683 _bJIN |
||
100 | _aJindal, Paridhi | ||
245 | 0 | _aImpact of claims on construction projects (Also available on CD) | |
260 | _c2017 | ||
300 | _avii,vii,46p.,CD-ROM | ||
505 | _aCONTENTS 1 Introduction 1 1.1 Background 1 1.2 Need of The Study 1 1.3 Objective of Study 1 1.4 Scope of study 1 1.5 Research Methodology 1 1.6 Timeline 2 1.7 Limitations of Study 2 2 Literature Review 3 2.1 Introduction 3 2.2 Conflict Versus D | ||
700 | _aShah, Reshma (Guide) | ||
891 | _a2012 Batch | ||
891 | _aFT-UG | ||
999 |
_c52710 _d52710 |