000 | 00670nam a2200157Ia 4500 | ||
---|---|---|---|
008 | 180516s9999||||xx |||||||||||||| ||und|| | ||
082 |
_aB TH-0679 _bMIS |
||
100 | _aMistry, Jayash | ||
245 | 0 | _aFactors leading to cost overruns in highway projects (Also available on CD) | |
260 | _c2017 | ||
300 | _axv,vii,39p.,CD-ROM | ||
505 | _aCONTENTS 1. INTRODUCTION 1 1.1 Background 1 1.2 Need and Objectives 1 1.3 Scope of Work: 2 1.4 Research Methodology: 3 1.5 Findings 3 2. LITERATURE REVIEW 4 2.1. Introduction 4 2.2 Determination of Cost Overrun Attributes 6 3. RESEARCH METH | ||
700 | _aPandit, Devanshu (Guide) | ||
891 | _a2012 Batch | ||
891 | _aFT-UG | ||
999 |
_c52706 _d52706 |