000 00670nam a2200157Ia 4500
008 180516s9999||||xx |||||||||||||| ||und||
082 _aB TH-0679
_bMIS
100 _aMistry, Jayash
245 0 _aFactors leading to cost overruns in highway projects (Also available on CD)
260 _c2017
300 _axv,vii,39p.,CD-ROM
505 _aCONTENTS 1. INTRODUCTION 1 1.1 Background 1 1.2 Need and Objectives 1 1.3 Scope of Work: 2 1.4 Research Methodology: 3 1.5 Findings 3 2. LITERATURE REVIEW 4 2.1. Introduction 4 2.2 Determination of Cost Overrun Attributes 6 3. RESEARCH METH
700 _aPandit, Devanshu (Guide)
891 _a2012 Batch
891 _aFT-UG
999 _c52706
_d52706