000 00712nam a2200157Ia 4500
008 180516s9999||||xx |||||||||||||| ||und||
082 _aB TH-0649
_bSHA
100 _aShah, Charmil
245 0 _aStudy of contract conditions leading to time and cost overruns in construction projects (Also available on CD)
260 _c2016
300 _avii,41p. CD-ROM
505 _aCONTENTS_x000D_ 1. Introduction 1_x000D_ 1.1 Background 1_x000D_ 1.2 Need Of Study 1_x000D_ 1.3 Objectives Of Study 1_x000D_ 1.4 Scope Of Study…_x000D_ 1.5 Overview Of Study Approach. 2_x000D_ 1.6 Research Methodology. 2_x000D_ 1.6.1 Research Design.
700 _aKaria, Nimitt (Guide)
891 _a2011 Batch
891 _aFT-UG
999 _c52678
_d52678