000 | 00712nam a2200157Ia 4500 | ||
---|---|---|---|
008 | 180516s9999||||xx |||||||||||||| ||und|| | ||
082 |
_aB TH-0649 _bSHA |
||
100 | _aShah, Charmil | ||
245 | 0 | _aStudy of contract conditions leading to time and cost overruns in construction projects (Also available on CD) | |
260 | _c2016 | ||
300 | _avii,41p. CD-ROM | ||
505 | _aCONTENTS_x000D_ 1. Introduction 1_x000D_ 1.1 Background 1_x000D_ 1.2 Need Of Study 1_x000D_ 1.3 Objectives Of Study 1_x000D_ 1.4 Scope Of Study…_x000D_ 1.5 Overview Of Study Approach. 2_x000D_ 1.6 Research Methodology. 2_x000D_ 1.6.1 Research Design. | ||
700 | _aKaria, Nimitt (Guide) | ||
891 | _a2011 Batch | ||
891 | _aFT-UG | ||
999 |
_c52678 _d52678 |