000 | 00721nam a2200157Ia 4500 | ||
---|---|---|---|
008 | 180516s9999||||xx |||||||||||||| ||und|| | ||
082 |
_aB TH-0616 _bJOS |
||
100 | _aJoshi, Saransh | ||
245 | 0 | _aAnalyzing the major causes for delay and subsequent cost overrun in container terminal projects (Also available on CD) | |
260 | _c2016 | ||
300 | _avi,36,iip. CD-ROM | ||
505 | _aCONTENTS_x000D_ Preface Ii_x000D_ Abstract Iii_x000D_ List Of Abbreviations: 1_x000D_ Introduction . 1_x000D_ Background: . 1_x000D_ Need: . 2_x000D_ Objective: . 3_x000D_ Literature Study: 4_x000D_ Time Overrun 4_x000D_ Cost Overrun 5_x000D_ Research Met | ||
700 | _aPandya, Chirayu (Guide) | ||
891 | _a2010 Batch | ||
891 | _aFT-UG | ||
999 |
_c52645 _d52645 |