000 00721nam a2200157Ia 4500
008 180516s9999||||xx |||||||||||||| ||und||
082 _aB TH-0616
_bJOS
100 _aJoshi, Saransh
245 0 _aAnalyzing the major causes for delay and subsequent cost overrun in container terminal projects (Also available on CD)
260 _c2016
300 _avi,36,iip. CD-ROM
505 _aCONTENTS_x000D_ Preface Ii_x000D_ Abstract Iii_x000D_ List Of Abbreviations: 1_x000D_ Introduction . 1_x000D_ Background: . 1_x000D_ Need: . 2_x000D_ Objective: . 3_x000D_ Literature Study: 4_x000D_ Time Overrun 4_x000D_ Cost Overrun 5_x000D_ Research Met
700 _aPandya, Chirayu (Guide)
891 _a2010 Batch
891 _aFT-UG
999 _c52645
_d52645