000 00765nam a2200181Ia 4500
008 180516s9999||||xx |||||||||||||| ||und||
082 _aCPM TH-0287
_bNAG
100 _aNagar, Suraj Shenoy
245 0 _aResource optimization for construction projects (Also available on CD)
260 _c2017
300 _axiv,80p.,CD-ROM
505 _aCONTENTS Acknowledgements iii Abstract iv List of figures vi List of tables vii List of abbreviations viii 1. Introduction 1 1.1. Work Outline 1 1.2. Applicability of the Study 2 1.3. Need for the Study 2 2. Research Design 4 2.1. Objectives of
700 _aDevkar, Ganesh (Guide)
700 _aJhaveri, Abhi Shah (Guide)
891 _a2015 Batch
891 _aConstruction and Planning Management
891 _aFT-PG
999 _c50865
_d50865