000 00753nam a2200169Ia 4500
008 180516s9999||||xx |||||||||||||| ||und||
082 _aCPM TH-0274
_bSHA
100 _aShah, Mohil
245 0 _aFactors affecting project overhead costs estimation in Government construction projects (Also available on CD)
260 _c2017
300 _aix,53p.,CD-ROM
505 _aCONTENTS Acknowledgements iii Abstract iv List of Figures v List of Tables v 1. Introduction 1 1.1. Background of the Research 1 1.2. Significance and Contributions of the Research 2 2. Research Design 4 2.1. Research Objective 4 2.2. Research M
700 _aPandit, Devanshu (Guide)
891 _a2015 Batch
891 _aConstruction and Planning Management
891 _aFT-PG
999 _c50852
_d50852