000 00772nam a2200169Ia 4500
008 180516s9999||||xx |||||||||||||| ||und||
082 _aCPM TH-0239
_bNAY
100 _aNayak, Sarverkhan M.
245 0 _aPerformance measure of metro rail project using social benefit cost and life cycle costing analysis (Also available on CD)
260 _c2013
300 _avii,70p.,CD-ROM
505 _aCONTENT APPROVAL CERTIFICATE i DECLARATION ii ACKNOWLEDGEMENT iii CONTENTS iv LIST OF FIGURES vi LIST OF TABLES vii LIST OF PLATES vii LIST OF ABBREVIATIONS vii CHAPTER 1 : INTRODUCTION 1 1.1 INTRODUCTION 2 1.2 NEED FOR STUDY 2 1.3 OBJECTIVES
700 _aSarkar, Debasis (Guide)
891 _a2011 Batch
891 _aConstruction and Planning Management
891 _aFT-PG
999 _c50817
_d50817