000 00774nam a2200169Ia 4500
008 180516s9999||||xx |||||||||||||| ||und||
082 _aCPM TH-0237
_bMAL
100 _aMalu, Bhushan
245 0 _aHybrid approach for resource management of bridge project using bootstrap technique and genetic algorithm (Also available on CD)
260 _c2013
300 _aviii,77p.,CD-ROM
505 _aCONTENT CHAPTER 1 : INTRODUCTION 1 1.1 Introduction 2 1.2 Need for study 2 1.3 Objectives 3 1.4 Scope of study 3 1.5 Methodology 3 1.6 Research plan 3 CHAPTER 2 : LITRATURE REVIEW 4 2.0 Introduction 5 2.1 Resource Optimization 6 2.2 Genetic Alg
700 _aSarkar, Debasis (Guide)
891 _a2011 Batch
891 _aConstruction and Planning Management
891 _aFT-PG
999 _c50815
_d50815