000 00761nam a2200169Ia 4500
008 180516s9999||||xx |||||||||||||| ||und||
082 _aCPM TH-0196
_bPAN
100 _aPanchal, Shashank
245 0 _aProject risk management of ports through an integrated ISM and Fuzzy approach (Also available on CD)
260 _c2012
300 _aix,97,xivp.,CD-ROM
505 _aCONTENTS Chapter 1 Introduction 1 1.1 Introduction 2 1.2 Need For Study 2 1.3 Objective 3 1.4 Methodology 3 1.5 Research Plan 4 Chapter 2 Literature Review 5 2.1 Introduction 6 2.2 Risk 7 2.3 Risk Management Process 7 2.3.1 Risk Id
700 _aSarkar, Debasis (Guide)
891 _a2009 Batch
891 _aConstruction and Project Management
891 _aFT-PG
999 _c50774
_d50774