000 | 04116nam a2200169Ia 4500 | ||
---|---|---|---|
999 |
_c47402 _d47402 |
||
008 | 180208s9999||||xx |||||||||||||| ||und|| | ||
082 |
_aB TH-0545 _bSHA |
||
100 |
_aShah, Sonam _986988 |
||
245 | 0 | _aStudy of life cycle costing for Griha-rated green buildings in India (Also available on CD) | |
260 | _c2009 | ||
300 | _avi,48,iv,20p.,CD-ROM | ||
505 | _aContents 1. INTRODUCTION TO THE STUDY 1.1 Present Scenario 1 1.2 Need For The Study 2 1.3 Objective Of The Study 2 1.4 Scope Of Study 2 1.5 Methodology Of Study 2 1.6 Schedule Of Study 4 2. LITERATURE STUDY 2.1 Terminology 5 2.2 Green Buildings For Economy And Efficiency 6 2.3 Life Cycle Costing- Concept 6 2.4 Why Life Cycle Costing? 6 2.5 History Of Life Cycle Costing 6 2.6 Procedure Of Life Cycle Costing 7 2.6.1 IDENTIFY ALTERNATIVES 7 2.6.2 DEFINE CONSTANT PARAMETERS 7 2.6.3 IDENTIFY COSTS AND SAVINGS 8 2.6.4 GENERATE LCC FOR EACH ALTERNATIVE 8 2.6.5 PERFORM LCC COMPARISON 8 2.7 Pros And Cons Of Life Cycle Costing 8 2.8 Costs Included In Life Cycle Costing 8 2.8.1 INITIAL INVESTMENT COSTS 9 2.8.2 CAPITAL REPLACEMENT COSTS 9 2.8.3 RESALE VALUE 9 2.8.4 OM&R COSTS 9 2.8.5 ENERGY COSTS 10 2.9 Parameters Affecting Life Cycle Costing 10 2.9.1 INFLATION RATE 11 2.9.2 DISCOUNT RATE1 11 2.9.3 ESCALATION RATE1 11 2.9.4 STUDY PERIOD 11 2.10 Present Value Factors1 11 2.10.1 SINGLE PRESENT VALUE FACTOR 11 2.10.2 UNIFORM PRESENT VALUE FACTOR 12 2.10.3 MODIFIED UNIFORM PRESENT VALUE FACTOR 12 2.11 Formula For Life Cycle Costing 12 2.12 Supplementary Measures Of Life Cycle Costing 13 2.12.1 NET SAVINGS 13 2.12.2 PAYBACK PERIOD 13 2.12.3 SAVINGS TO INVESTMENT RATIO 13 2.12.4 SENSITIVITY ANALYSIS 14 3. DATA COLLECTION 3.1. Selection Criteria For Case Studies 15 3.2. Methodology Of Data Collection 15 3.3. Questionnaire 16 3.3.1 ANSWERS TO QUESTIONNAIRE FOR CASE 1- CESE BUILDING, IIT, KANPUR 16 3.3.2 ANSWERS TO QUESTIONNAIRE FOR CASE 2- GREEN SPACES, FARIDABAD, HARYANA 19 4. DATA ANALYSIS 4.1 Methodology Of Data Analysis 24 4.2 Cost Segregation 25 4.3 Inflation Rate, Discount Rate & Escalation Rate 25 4.4 Present Value Factors 26 4.4.1 SINGLE PRESENT VALUE FACTOR (SPV) 26 4.4.2 UNIFORM PRESENT VALUE FACTOR (UPV) 26 4.4.3 MODIFIED UNIFORM PRESENT VALUE FACTOR (UPV*) 26 4.5 Single Costs 27 4.5.1 CASE 1: CESE BUILDING, IIT, KANPUR 27 4.5.2 CASE 2: GREEN SPACES, FARIDABAD, HARYANA 28 4.5.3 REPLACEMENT COSTS OF LIGHTING FIXTURES 28 4.5.4 PRESENT VALUE OF SINGLE COSTS FOR CASE 1 & CASE 2 31 4.6 Uniformly Annually Recurring Costs 32 4.6.1 CASE 1: CESE BUILDING, IIT, KANPUR 32 4.6.2 CASE 2: GREEN SPACES, FARIDABAD, HARYANA 32 4.6.3 PRESENT VALUE OF UNIFORMLY ANNUALLY RECURRING COSTS FOR CASE 1 & CASE 2 32 4.7 Non- Uniformly Annually Recurring Costs 33 4.7.1 CASE 1: CESE BUILDING, IIT, KANPUR 33 4.7.2 CASE 2: GREEN SPACES, FARIDABAD, HARYANA 33 4.7.3 PRESENT VALUE OF NON-UNIFORMLY ANNUALLY RECURRING COSTS FOR CASE 1 & CASE 2 34 4.8 Life Cycle Costs 34 4.8.1 CASE 1: CESE BUILDING, IIT, KANPUR 35 4.8.2 CASE 2: GREEN SPACES, FARIDABAD, HARYANA 36 4.9 Net Savings, Payback Period & Savings To Investment Ratio 37 4.9.1 CASE 1: CESE BUILDING, IIT, KANPUR 37 4.9.2 CASE 2: GREEN SPACES, FARIDABAD, HARYANA 39 4.10 Sensitivty Analysis 41 4.10.1 DISCOUNT RATE 41 4.10.2 ESCALATION RATE 42 4.10.3 ENERGY CHARGES 43 5. CONCLUSION 5.1 Major Outcomes From Questionnaire 45 5.2 Major Outcomes Of The Study 46 6. FUTURE RECOMMENDATIONS 6.1 Recommendations 47 6.2 Future Scope Of Study 47 ANNEXURE FORMAT OF QUESTIONNAIRE I A. GENERAL DETAILS I B. ENVELOPE DETAILS II C. LIGHTING DETAILS III D. ELECTRICAL DETAILS III E. HVAC DETAILS III | ||
700 |
_aMajumdar, Mili (Guide) _986989 |
||
890 | _aIndia | ||
891 | _a2004 Batch | ||
891 | _aFT-UG |