000 01075nam a2200169Ia 4500
020 _a8189401238
082 _a624.11
_bARO
100 _aArora, K.R.
245 _aSurveying Vol.I in SI units
250 _aEd.13
260 _aNew Delhi
_bStandard Book House
_c2012
300 _axiv,690p.
500 _aCONTENTS 1. INTRODUCTION AND BASIC CONCEPTS 1 2. ACCURACY, PRECISION AND ERRORS 36 3. LINEAR MEASUREMENTS 54 4.ELECTROMAGNETIC DISTANCE MEASUREMENT (EDM) 108 5. ELECTRONIC THEODOLITES AND TACHEOMETERS 130 6. GLOBAL POSITIONING SYSTEM 141 7. CHAIN SURVEYING 149 8. COMPASS SURVEYING 204 9. LEVELLING PRINCIPLES260 10. LEVELLING PRACTICE AND CONTOURING 312 11.PLANE TABLE SURVEYING 380 12. MINOR INSTRUMENTS 410 13. VERNIER THEODOLITES 433 14. THEODOLITE TRAVERSE 484 15.TRAVERSE COMPUTATIONS AND ADJUSTMENTS 515 16. COMPUTATION OF AREAS 553 17. COMPUTATION OF VOLUMES 597 18.SETTING OUT WORKS 659 APPENDIX : COLOURED PHOTOGRATHS 677 INDEX 685
890 _aIndia
891 _aSchool of Building Science & Technology, CEPT Uni.
999 _c33307
_d33307