Image from Google Jackets

Availability of coal for power generation : issues and challenges (Also available on CD)

By: Contributor(s): Material type: TextTextPublication details: 2013Description: ix,liii,35p.,CD-ROMDDC classification:
  • P TH-1586 THO
Contents:
TABLE OF CONTENTS Abbreviations iv List of Figures v List of Tables vi Executive Summary vii 1. BACKGROUND 1 1.1. INTRODUCTION 1 1.2. POWER SECTOR 2 1.3. NEED OF THE STUDY 4 1.4. AIM 5 1.5. RESEARCH QUESTIONS 5 1.6. OBJECTIVES 5 1.7. SCOPE & LIMITATIONS OF THE STUDY 5 1.8. METHODOLOGY 6 2. INDIAN COAL SECTOR 7 2.1. INTRODUCTION 8 2.2. LEGAL AND INSTITUTIONAL FRAMEWORK 10 2.2.1. LEGAL FRAMEWORK 11 2.2.2. INSTITUTIONAL FRAMEWORK 13 2.2. COAL RESERVES IN THE COUNTRY 15 2.2.1. COAL EXPLORATION 15 2.2.2. CLASSIFICATION OF COAL RESERVES 16 2.2.3. INVENTORY OF GEOLOGICAL COAL RESOURCES 17 3. INDIAN POWER SECTOR 20 3.1. INTRODUCTION 20 3.2. POWER SECTOR - COAL DEMAND AND SUPPLY 23 3.3. COAL AVAILABILITY IN THERMAL POWER PLANTS 24 3.3.1. COAL STOCKING NORMS AT THE POWER PLANTS .......... Error! Bookmark not defined. 25 3.3.2. COAL AVAILABILITY IN THERMAL POWER PLANTS Error! Bookmark not defined.28 4. REASONS FOR SHORTAGE OF COAL 29 4.1. ISSUES IN CAPTIVE BLOCK DEVELOPMENT 30 4.2. IMPORT PRICE PARITY OF COAL 39 4.3. EXPLORATION PLANNING 40 4.4. HUMAN PRODUCTIVITY 42 4.5. TRANSPORTATION 43 5. CONCLUSION.45 References x Annexure-I xiii Annexure-II xxv Annexure-III xlv
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Collection Call number Status Date due Barcode Item holds
Thesis CEPT Library Faculty of Planning P TH-1586 THO Not for loan 011660
Total holds: 0

TABLE OF CONTENTS Abbreviations iv List of Figures v List of Tables vi Executive Summary vii 1. BACKGROUND 1 1.1. INTRODUCTION 1 1.2. POWER SECTOR 2 1.3. NEED OF THE STUDY 4 1.4. AIM 5 1.5. RESEARCH QUESTIONS 5 1.6. OBJECTIVES 5 1.7. SCOPE & LIMITATIONS OF THE STUDY 5 1.8. METHODOLOGY 6 2. INDIAN COAL SECTOR 7 2.1. INTRODUCTION 8 2.2. LEGAL AND INSTITUTIONAL FRAMEWORK 10 2.2.1. LEGAL FRAMEWORK 11 2.2.2. INSTITUTIONAL FRAMEWORK 13 2.2. COAL RESERVES IN THE COUNTRY 15 2.2.1. COAL EXPLORATION 15 2.2.2. CLASSIFICATION OF COAL RESERVES 16 2.2.3. INVENTORY OF GEOLOGICAL COAL RESOURCES 17 3. INDIAN POWER SECTOR 20 3.1. INTRODUCTION 20 3.2. POWER SECTOR - COAL DEMAND AND SUPPLY 23 3.3. COAL AVAILABILITY IN THERMAL POWER PLANTS 24 3.3.1. COAL STOCKING NORMS AT THE POWER PLANTS .......... Error! Bookmark not defined. 25 3.3.2. COAL AVAILABILITY IN THERMAL POWER PLANTS Error! Bookmark not defined.28 4. REASONS FOR SHORTAGE OF COAL 29 4.1. ISSUES IN CAPTIVE BLOCK DEVELOPMENT 30 4.2. IMPORT PRICE PARITY OF COAL 39 4.3. EXPLORATION PLANNING 40 4.4. HUMAN PRODUCTIVITY 42 4.5. TRANSPORTATION 43 5. CONCLUSION.45 References x Annexure-I xiii Annexure-II xxv Annexure-III xlv

There are no comments on this title.

to post a comment.
Excel To HTML using codebeautify.org Sheet Name :- Location Chart
Location Chart Basement 1 (B1) Class No. 600 - 649, 660 - 699
(B1) :Mezzanine 1 Class No. 700 - 728
(B1) :Mezzanine 2 Class No. 728.1 - 799, 650 - 659, Reference Books, Faculty work
Basement 2 (B2) Class No. 000 - 599, 800-999
Basement 3 (B3) (Please Inquire at the Counter for resources) Theses, Students' works, Bound Journals, Drawings, Atlas, Oversize Books, Rare Books, IS codes, Non-book Materials