Performance measure of metro rail project using social benefit cost and life cycle costing analysis (Also available on CD)
Material type: TextPublication details: 2013Description: vii,70p.,CD-ROMDDC classification:- CPM TH-0239 NAY
Contents:
CONTENT APPROVAL CERTIFICATE i DECLARATION ii ACKNOWLEDGEMENT iii CONTENTS iv LIST OF FIGURES vi LIST OF TABLES vii LIST OF PLATES vii LIST OF ABBREVIATIONS vii CHAPTER 1 : INTRODUCTION 1 1.1 INTRODUCTION 2 1.2 NEED FOR STUDY 2 1.3 OBJECTIVES
Item type | Current library | Collection | Call number | Status | Date due | Barcode | Item holds | |
---|---|---|---|---|---|---|---|---|
Thesis | CEPT Library | Faculty of Technology | CPM TH-0239 NAY | Not for loan | 012646 |
Total holds: 0
CONTENT APPROVAL CERTIFICATE i DECLARATION ii ACKNOWLEDGEMENT iii CONTENTS iv LIST OF FIGURES vi LIST OF TABLES vii LIST OF PLATES vii LIST OF ABBREVIATIONS vii CHAPTER 1 : INTRODUCTION 1 1.1 INTRODUCTION 2 1.2 NEED FOR STUDY 2 1.3 OBJECTIVES
There are no comments on this title.
Log in to your account to post a comment.