Delhi metro project implementation handbook phase - II

By: Material type: TextTextPublication details: New Delhi Delhi Metro Rail Corp. Ltd.Description: 302pDDC classification:
  • 388.4 DAY
Summary: CONTENT 1. Foreword 3 2. Editor's Note 5 3. Acknowledgement 7 4. Introduction of Phase II 1 Anuj Dayal 5. Challenges of Indraprastha-NOIDA City Centre Corridor 23 H.K.Sharma T.K.Bhosle A. K. Ahuja Sirajul Hoque 6. Challenges of Yamuna Bank-Anand Vihar - Vaishali Corridor 41 B.R.Pasrija 7. Challenges of Central Sectt-Qutab Minar-HUDA City Centre Line 45 Daljeet Singh & A.S. Bisht Jitender Tyagi D.P. Gurav SanjeevMalik 8. Challenges of Central Sectt - Sarita Vihar - Badarpur Line 95 Saleem Ahmed 9. Challenges of Airport Express Line 107 O.P. Singh & P.K. Garg Ravi Kapoor O.P. Singh & S.C. Gupta 10. Challenges of Laying Metro Track 133 S.C. Gupta 11. Challenges of Telecom and Signalling 139 Prashant Rao Navneet Kaushik Sajeev Maheshwari Vinay Kumar Gupta 12. Challenges in Electrical Works 161 Satish Kumar Sharat Sharma A. K. Garg R. Sahai 13. Challenges of Design and Architecture 189 Rajan Kataria 14. Challenges of Safety 225 Devendra Gill 15. ChaUenges of RoUing Stock 237 H.S. Anand Malay Saha 16. Challenges of Tendering 267 Sahadeva Singh 17. ChaUenges of HR & Recruitment 273 S. K. Sinha 18. Challenges of Metro Tunnel Construction 279 J.Tyagi S. Lowry K. Yamaoka C. Izumi T. Dorfner B.K. Mishra C. Lovelock S.K. Gupta
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Collection Call number Status Notes Date due Barcode Item holds
Book CEPT Library BK 388.4 DAY Available GRATIS 013229
Total holds: 0

CONTENT
1. Foreword 3
2. Editor's Note 5
3. Acknowledgement 7
4. Introduction of Phase II 1
Anuj Dayal
5. Challenges of Indraprastha-NOIDA City Centre Corridor 23
H.K.Sharma T.K.Bhosle A. K. Ahuja Sirajul Hoque
6. Challenges of Yamuna Bank-Anand Vihar - Vaishali Corridor 41
B.R.Pasrija
7. Challenges of Central Sectt-Qutab Minar-HUDA City Centre Line 45
Daljeet Singh & A.S. Bisht Jitender Tyagi
D.P. Gurav
SanjeevMalik
8. Challenges of Central Sectt - Sarita Vihar - Badarpur Line 95
Saleem Ahmed
9. Challenges of Airport Express Line 107
O.P. Singh & P.K. Garg
Ravi Kapoor
O.P. Singh & S.C. Gupta
10. Challenges of Laying Metro Track 133
S.C. Gupta
11. Challenges of Telecom and Signalling 139
Prashant Rao
Navneet Kaushik
Sajeev Maheshwari
Vinay Kumar Gupta
12. Challenges in Electrical Works 161
Satish Kumar
Sharat Sharma
A. K. Garg
R. Sahai
13. Challenges of Design and Architecture 189
Rajan Kataria
14. Challenges of Safety 225
Devendra Gill

15. ChaUenges of RoUing Stock 237
H.S. Anand
Malay Saha
16. Challenges of Tendering 267
Sahadeva Singh
17. ChaUenges of HR & Recruitment 273
S. K. Sinha
18. Challenges of Metro Tunnel Construction 279
J.Tyagi
S. Lowry K. Yamaoka C. Izumi T. Dorfner B.K. Mishra C. Lovelock S.K. Gupta



There are no comments on this title.

to post a comment.
Excel To HTML using codebeautify.org Sheet Name :- Location Chart
Location Chart Basement 1 (B1) Class No. 600 - 649, 660 - 699
(B1) :Mezzanine 1 Class No. 700 - 728
(B1) :Mezzanine 2 Class No. 728.1 - 799, 650 - 659, Reference Books, Faculty work
Basement 2 (B2) Class No. 000 - 599, 800-999
Basement 3 (B3) (Please Inquire at the Counter for resources) Theses, Students' works, Bound Journals, Drawings, Atlas, Oversize Books, Rare Books, IS codes, Non-book Materials