Image from Google Jackets

Post occupancy evaluation : case of C G road, Ahmedabad (Softcopy is also available)

By: Contributor(s): Material type: TextTextPublication details: 2023Description: xix,152pDDC classification:
  • P TH-2847 TIW
Contents:
Table of contents Undertaking iii Certificate iii Acknowledgments v Executive Summary vii Abstract xiii Table of contents xi List of figures xiii List of tables xvii List of Annexures xviii List of Maps xix 1 Introduction 1 1.1 Background of the project 1 1.2 Research Questions 9 1.3 Need for study / Research Gap 9 1.4 Post-Occupancy Evaluation 9 1.5 Aim & Objectives 10 1.6 Methodology 11 1.7 Scope & Limitations 12 2 Post-Occupancy Evaluation 13 2.1 Introduction 13 2.2 Post-Occupancy Evaluation Framework 13 2.3 Evaluation parameters 16 3 Pedestrian Safety and Comfort 19 3.1 Walkway 20 3.2 Pedestrian Crossings 30 3.3 Seatings 42 3.4 Street lighting 50 3.5 Shading 58 4 Parking, IPT & Traffic management 65 4.1 Vehicular lane 66 4.2 Traffic junctions 70 4.3 Parking 72 4.4 Bus stops 92 4.5 Intermediate Public Transport (IPT) 94 4.6 Non-Motorized Transport (NMT) 97 5 Street Activities 101 5.1 Street Vendors 101 5.2 Active & Passive frontages 110 6 Trees & Shrubs 115 6.1 Trees 115 6.2 Planters / Shrubs 119 7 Maintenance & Cleanliness 123 7.1 Dustbins 123 7.2 Maintenance of street elements 128 7.3 Infrastructure 132 8 Conclusion and Recommendation 134 References 141 Appendix 1: Survey formats 143 Appendix 2: Regulations for vehicular entry to Individual/ Private Plots for C G Road Refurbishment Project at Ahmedabad (Source: HCP 150
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Collection Call number Status Date due Barcode Item holds
Thesis CEPT Library Faculty of Planning P TH-2847 TIW Not For Loan 025493
Total holds: 0

Table of contents
Undertaking iii
Certificate iii
Acknowledgments v
Executive Summary vii
Abstract xiii
Table of contents xi
List of figures xiii
List of tables xvii
List of Annexures xviii
List of Maps xix
1 Introduction 1
1.1 Background of the project 1
1.2 Research Questions 9
1.3 Need for study / Research Gap 9
1.4 Post-Occupancy Evaluation 9
1.5 Aim & Objectives 10
1.6 Methodology 11
1.7 Scope & Limitations 12
2 Post-Occupancy Evaluation 13
2.1 Introduction 13
2.2 Post-Occupancy Evaluation Framework 13
2.3 Evaluation parameters 16
3 Pedestrian Safety and Comfort 19
3.1 Walkway 20
3.2 Pedestrian Crossings 30
3.3 Seatings 42
3.4 Street lighting 50
3.5 Shading 58
4 Parking, IPT & Traffic management 65
4.1 Vehicular lane 66
4.2 Traffic junctions 70
4.3 Parking 72
4.4 Bus stops 92
4.5 Intermediate Public Transport (IPT) 94
4.6 Non-Motorized Transport (NMT) 97
5 Street Activities 101
5.1 Street Vendors 101
5.2 Active & Passive frontages 110
6 Trees & Shrubs 115
6.1 Trees 115
6.2 Planters / Shrubs 119
7 Maintenance & Cleanliness 123
7.1 Dustbins 123
7.2 Maintenance of street elements 128
7.3 Infrastructure 132
8 Conclusion and Recommendation 134
References 141
Appendix 1: Survey formats 143
Appendix 2: Regulations for vehicular entry to Individual/ Private Plots for C G Road
Refurbishment Project at Ahmedabad (Source: HCP 150

There are no comments on this title.

to post a comment.
Excel To HTML using codebeautify.org Sheet Name :- Location Chart
Location Chart Basement 1 (B1) Class No. 600 - 649, 660 - 699
(B1) :Mezzanine 1 Class No. 700 - 728
(B1) :Mezzanine 2 Class No. 728.1 - 799, 650 - 659, Reference Books, Faculty work
Basement 2 (B2) Class No. 000 - 599, 800-999
Basement 3 (B3) (Please Inquire at the Counter for resources) Theses, Students' works, Bound Journals, Drawings, Atlas, Oversize Books, Rare Books, IS codes, Non-book Materials