Bus-stop infrastructure asset management plan : a case of Lucknow (Softcopy is also available)
Material type: TextPublication details: 2023Description: xiii,56pDDC classification:- P TH-2770 NIV
Item type | Current library | Collection | Call number | Status | Date due | Barcode | Item holds | |
---|---|---|---|---|---|---|---|---|
Thesis | CEPT Library | Faculty of Planning | P TH-2770 NIV | Not For Loan | 025387 |
Table of contents
Undertaking i
Acknowledgments ii
Abstract iii
Table of contents iv
List of figures v
List of tables vi
Chapter - 1 Introduction 2
1.1 Background 2
1.2 Aim 3
1.3 Objectives 3
1.4 Study methodology 4
Chapter - 2 Literature Study 6
2.1 Introduction to Bus stop Infrastructure 6
2.2 Guidelines for bus stop infrastructure by MoRTH 6
2.3 Typology of bus stop 8
2.4 Funding for operation & Maintenance 12
2.5 Alternative revenue sources in bus stop Infrastructure 12
2.6 Revenue sharing mechanism for bus stop financing. 13
2.7 Revenue from bus stops 16
Chapter - 3 Case Study of practices in Indian cities 18
3.1 Special Case study on smart bus stops 19
Chapter - 4 Asset Management framework 24
Chapter - 5 Case study City - Lucknow 26
5.1 Application of asset management famework in the case city 28
5.2 Bus route demand 35
5.3 Bus stop Classification 36
5.4 Identifying the bus stops with revenue potential 39
5.5 Maintenance schedule & Contracting strategies to reduce O & M cost. 40
5.6 Service Level benchmarks for bus stops 41
5.7 Lifecycle Cost model for the bus stops 43
5.8 Capital cost for bus stop. 43
5.9 Operational cost for bus stop 44
5.10 Revenue calculation from bus stop 45
Chapter - 6 Annexure 50
6.1 Phasing of bus stops 50
6.2 Assumptions for revenue potential for bus stops. 51
6.3 Capital Cost Calculation 52
Chapter - 7 Bibliography 54
There are no comments on this title.