Image from Google Jackets

Automated green building rating systems for India (Soft copy is also available)

By: Contributor(s): Material type: TextTextPublication details: 2020Description: x,42pDDC classification:
  • B TH-0874 TRI
Contents:
Contents 1 INTRODUCTION 1 1.1 GREEN BUILDINGS1 1.2 BUILDING INFORMATION MODELING (BIM) 2 1.3 NEED FOR STUDY 3 1.4 OBJECTIVE 4 1.5 SCOPE OF WORK AND METHODOLOGY 4 1.6 LIMITATIONS OF THE RESEARCH 4 1.7 THESIS TIMELINE 4 2 LITERATURE REVIEW 5 2.1 BUILDING INFORMATION MODELLING (BIM) 5 2.1.1 ADVANTAGES OF BIM 6 2.1.2 DISADVANTAGES OF BIM 6 2.2 GREEN BUILDINGS6 2.2.1 INDIAN GREEN BUILDING COUNCIL (IGBC) 6 2.2.2 PRECERTIFICATION PROCESS 8 2.2.3 IGBC NEW BUILDING CREDITS 9 2.3 GREEN BIM10 2.4 DATA EXTRACTION METHOD 11 2.4.1 EXTERNAL ANALYSIS 11 2.4.2 INTERNAL ANALYSIS 12 2.5 RESEARCH GAP14 3 RESEARCH METHODOLOGY 16 3.1 OVERVIEW 16 3.2 PROPOSED FRAMEWORK 16 3.3 FRAMEWORK FOR PLUG-IN DEVELOPMENT 19 4 DATA COLLECTION 21 4.1 BIM ISSUES USED FOR GREEN BUILDING ANALYSIS 21 4.2 SOFTWARE USED 21 4.3 CASE STUDY 22 4.3.1 CASE STUDY 1 23 4.3.2 CASE STUDY 2 23 4.3.3 CASE STUDY 3 23 5 ANALYSIS 24 5.1 SURVEY ANALYSIS 24 5.2 PRACTICAL APPROACH 26 5.2.1 INPUT PROCESS 28 5.2.2 OUTPUT 32 5.3 ADVANTAGES OF USING PLUG-IN 34 5.4 LIMITATIONS OF PLUG-IN 35 6 CONCLUSION AND FUTURE SCOPE 36 7 REFERENCES 37 8 ANNEXURE i 8.1 QUESTIONNAIRE i 8.1.1 CREDIT EARNED AND ANALYSIS TYPE i 8.1.2 CREDIT ALLOCATION STAGE AND SOFTWARE USED ii 8.2 CONCEPTUAL FRAMEWORK ii
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Collection Call number Status Date due Barcode Item holds
Thesis CEPT Library Faculty of Technology B TH-0874 TRI Not for loan 022643
Total holds: 0

Contents
1 INTRODUCTION 1
1.1 GREEN BUILDINGS1
1.2 BUILDING INFORMATION MODELING (BIM) 2
1.3 NEED FOR STUDY 3
1.4 OBJECTIVE 4
1.5 SCOPE OF WORK AND METHODOLOGY 4
1.6 LIMITATIONS OF THE RESEARCH 4
1.7 THESIS TIMELINE 4
2 LITERATURE REVIEW 5
2.1 BUILDING INFORMATION MODELLING (BIM) 5
2.1.1 ADVANTAGES OF BIM 6
2.1.2 DISADVANTAGES OF BIM 6
2.2 GREEN BUILDINGS6
2.2.1 INDIAN GREEN BUILDING COUNCIL (IGBC) 6
2.2.2 PRECERTIFICATION PROCESS 8
2.2.3 IGBC NEW BUILDING CREDITS 9
2.3 GREEN BIM10
2.4 DATA EXTRACTION METHOD 11
2.4.1 EXTERNAL ANALYSIS 11
2.4.2 INTERNAL ANALYSIS 12
2.5 RESEARCH GAP14
3 RESEARCH METHODOLOGY 16
3.1 OVERVIEW 16
3.2 PROPOSED FRAMEWORK 16
3.3 FRAMEWORK FOR PLUG-IN DEVELOPMENT 19
4 DATA COLLECTION 21
4.1 BIM ISSUES USED FOR GREEN BUILDING ANALYSIS 21
4.2 SOFTWARE USED 21
4.3 CASE STUDY 22
4.3.1 CASE STUDY 1 23
4.3.2 CASE STUDY 2 23
4.3.3 CASE STUDY 3 23
5 ANALYSIS 24
5.1 SURVEY ANALYSIS 24
5.2 PRACTICAL APPROACH 26
5.2.1 INPUT PROCESS 28
5.2.2 OUTPUT 32
5.3 ADVANTAGES OF USING PLUG-IN 34
5.4 LIMITATIONS OF PLUG-IN 35
6 CONCLUSION AND FUTURE SCOPE 36
7 REFERENCES 37
8 ANNEXURE i
8.1 QUESTIONNAIRE i
8.1.1 CREDIT EARNED AND ANALYSIS TYPE i
8.1.2 CREDIT ALLOCATION STAGE AND SOFTWARE USED ii
8.2 CONCEPTUAL FRAMEWORK ii

There are no comments on this title.

to post a comment.
Excel To HTML using codebeautify.org Sheet Name :- Location Chart
Location Chart Basement 1 (B1) Class No. 600 - 649, 660 - 699
(B1) :Mezzanine 1 Class No. 700 - 728
(B1) :Mezzanine 2 Class No. 728.1 - 799, 650 - 659, Reference Books, Faculty work
Basement 2 (B2) Class No. 000 - 599, 800-999
Basement 3 (B3) (Please Inquire at the Counter for resources) Theses, Students' works, Bound Journals, Drawings, Atlas, Oversize Books, Rare Books, IS codes, Non-book Materials