Image from Google Jackets

Contractual clauses for BIM enablad projects (Softcopy is also available)

By: Contributor(s): Material type: TextTextPublication details: 2019Description: ii,4,47pDDC classification:
  • B TH-0829 SHA
Contents:
Contents 1 Introduction 1 1.1 Background 1 1.2 Need for the study 1 1.3 Objectives 2 1.4 Research Question 2 1.5 Scope of work 2 1.6 Research design 2 1.7 Resources Required 3 1.8 Expected outcome & usefulness of the finding 3 2 Literature Study 4 2.1 BIM and construction contracts 4 2.1.1 Worldwide Adoption 5 2.1.2 Previous studies and further scope 7 2.2 Literature study: Identification of Research methods 8 2.3 Literature review and summary 9 3 Research Methodology 11 4 Data Collection and Review 14 4.1 Preliminary Data Collection 14 4.2 Case Studies: Selection and Review 15 4.2.1 Nagpur Metro Rail Project 15 4.2.2 Ahmedabad Metro Rail Project 17 4.3 Project Delivery Method 22 4.4 Areas for Qualitative study 22 5 Data Validation and Output 28 5.1 Criteria for Clauses for Design and Build Project 38 6 Future scope of Thesis and Limitations 41 6.1 Limitations 41 Bibliography 42 Annexure 44
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Collection Call number Status Date due Barcode Item holds
Thesis CEPT Library Faculty of Technology B TH-0829 SHA Not for loan 021355
Total holds: 0

Contents
1 Introduction 1
1.1 Background 1
1.2 Need for the study 1
1.3 Objectives 2
1.4 Research Question 2
1.5 Scope of work 2
1.6 Research design 2
1.7 Resources Required 3
1.8 Expected outcome & usefulness of the finding 3
2 Literature Study 4
2.1 BIM and construction contracts 4
2.1.1 Worldwide Adoption 5
2.1.2 Previous studies and further scope 7
2.2 Literature study: Identification of Research methods 8
2.3 Literature review and summary 9
3 Research Methodology 11
4 Data Collection and Review 14
4.1 Preliminary Data Collection 14
4.2 Case Studies: Selection and Review 15
4.2.1 Nagpur Metro Rail Project 15
4.2.2 Ahmedabad Metro Rail Project 17
4.3 Project Delivery Method 22
4.4 Areas for Qualitative study 22
5 Data Validation and Output 28
5.1 Criteria for Clauses for Design and Build Project 38
6 Future scope of Thesis and Limitations 41
6.1 Limitations 41
Bibliography 42
Annexure 44

There are no comments on this title.

to post a comment.
Excel To HTML using codebeautify.org Sheet Name :- Location Chart
Location Chart Basement 1 (B1) Class No. 600 - 649, 660 - 699
(B1) :Mezzanine 1 Class No. 700 - 728
(B1) :Mezzanine 2 Class No. 728.1 - 799, 650 - 659, Reference Books, Faculty work
Basement 2 (B2) Class No. 000 - 599, 800-999
Basement 3 (B3) (Please Inquire at the Counter for resources) Theses, Students' works, Bound Journals, Drawings, Atlas, Oversize Books, Rare Books, IS codes, Non-book Materials