Image from Google Jackets

Lake renewal and lake redevelopment project : envisioning lakes as a social node : a case of Bellandur lake (Also available on CD)

By: Contributor(s): Material type: TextTextPublication details: 2018Description: a-d,xii,114p.,iiisheets,CD-ROMDDC classification:
  • M.Arch TH-0171 SRI
Contents:
CONTENTS Abstract i Acknowledgement iii Contents v List of Abbrevations vii List of Figures ix 1 Introduction & Background 1 1.1 Bangalore city 1 1.2 Fragmented development 2 1.3 Urbanisation in Bangalore City 3 1.4 Bangalore city and its lakes 5 1.5 Change in the Narrative of the lakes 7 1.6 Problem Statement 10 1.7 Design Question 10 1.8 Aim 10 1.9 Objective 11 1.10 Scope and Limitation 11 1.11 Methodology 11 2 Establishing a Theoretical Premise 13 2.1 Understanding the urban lake in todays context 13 2.2 Urban lake as a social- ecological system 14 2.3 Preserving the ecological system 14 2.4 Reconnecting the lake to the community - re establishing value 16 2.5 Public spaces in Bangalore 18 2.6 Lake as a social node 19 3 Case Studies 20 3.1 Hussain Sagar Lake 20 3.2 Kaikondranahalli Lake 24 3.3 ManSagar Lake 29 4 Site Analysis - Catchment Area 33 4.1 Bellandur Lake - Catchment area 34 4.2 Catchment area - ecology 36 4.3 Effect of Urbanistion in the Catchement area 38 4.4 Bellandur Lake Series 40 5 Site Analysis - Bellandur Lake 41 5.1 Bellandur Lake Study . 41 5.2 Bellandur Lake Surrounding 43 5.3 Building use analysis 45 5.4 Push and Pull factors- Mapping the Social Activity 47 5.5 Land Ownership Mapping 49 6 Issues of the lake 51 7 Potential of the lake - as an inclusive public space 53 8 Vision 57 9 Zoning & Conceptual Idea 65 10 Issues- Strategies 69 11 Structure plan 83 11.1 Demo Area Detail 1 84 11.2 Demo Area Detail 2 90 11.3 Demo Area Detail 3 94 11.4 Demo Area Detail 4 98 11.5 Views 102 12 Conclusion 105 13 References 108 14 Appendices 109
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Collection Call number Status Date due Barcode Item holds
Thesis CEPT Library Faculty of Architecture M.Arch TH-0171 SRI Not for loan 020428
Total holds: 0

CONTENTS
Abstract i
Acknowledgement iii
Contents v
List of Abbrevations vii
List of Figures ix
1 Introduction & Background 1
1.1 Bangalore city 1
1.2 Fragmented development 2
1.3 Urbanisation in Bangalore City 3
1.4 Bangalore city and its lakes 5
1.5 Change in the Narrative of the lakes 7
1.6 Problem Statement 10
1.7 Design Question 10
1.8 Aim 10
1.9 Objective 11
1.10 Scope and Limitation 11
1.11 Methodology 11
2 Establishing a Theoretical Premise 13
2.1 Understanding the urban lake in todays context 13
2.2 Urban lake as a social- ecological system 14
2.3 Preserving the ecological system 14
2.4 Reconnecting the lake to the community - re establishing value 16
2.5 Public spaces in Bangalore 18
2.6 Lake as a social node 19
3 Case Studies 20
3.1 Hussain Sagar Lake 20
3.2 Kaikondranahalli Lake 24
3.3 ManSagar Lake 29
4 Site Analysis - Catchment Area 33
4.1 Bellandur Lake - Catchment area 34
4.2 Catchment area - ecology 36
4.3 Effect of Urbanistion in the Catchement area 38
4.4 Bellandur Lake Series 40
5 Site Analysis - Bellandur Lake 41
5.1 Bellandur Lake Study . 41
5.2 Bellandur Lake Surrounding 43
5.3 Building use analysis 45
5.4 Push and Pull factors- Mapping the Social Activity 47
5.5 Land Ownership Mapping 49
6 Issues of the lake 51
7 Potential of the lake - as an inclusive public space 53
8 Vision 57
9 Zoning & Conceptual Idea 65
10 Issues- Strategies 69
11 Structure plan 83
11.1 Demo Area Detail 1 84
11.2 Demo Area Detail 2 90
11.3 Demo Area Detail 3 94
11.4 Demo Area Detail 4 98
11.5 Views 102
12 Conclusion 105
13 References 108
14 Appendices 109

There are no comments on this title.

to post a comment.
Excel To HTML using codebeautify.org Sheet Name :- Location Chart
Location Chart Basement 1 (B1) Class No. 600 - 649, 660 - 699
(B1) :Mezzanine 1 Class No. 700 - 728
(B1) :Mezzanine 2 Class No. 728.1 - 799, 650 - 659, Reference Books, Faculty work
Basement 2 (B2) Class No. 000 - 599, 800-999
Basement 3 (B3) (Please Inquire at the Counter for resources) Theses, Students' works, Bound Journals, Drawings, Atlas, Oversize Books, Rare Books, IS codes, Non-book Materials