Image from Google Jackets

Study of managerial issues in the implementation of resettlement and rehabilitation process : a case study of Ahmedabad metro rail project (Softcopy is also available)

By: Contributor(s): Material type: TextTextPublication details: 2018Description: 58pDDC classification:
  • MTM TH-0157 PAN
Contents:
Contents List of Abbreviations 6 ABSTRACT 7 Table of Contents 9 Chapter: 1 Introduction 11 1.1 Resettlement: 11 1.2 Rehabilitation: 11 1.3Resettlement and Rehabilitation in urban developmental projects: 11 1.4 Functions of Resettlement: 12 1.5 Reasons for Resettlement of people: 12 1.6 Issues related to Resettlement of people: 12 1.7 Objectives of Rehabilitation: 13 Chapter 2: Introduction to the Case Study: 14 2.1 Components of Resettlement and Rehabilitation (MEGA): 14 2.2 Stakeholder Mapping: 15 2.3 Problem Statement: 16 2.4 Aim of the Project: 16 2.5 Objectives of the Project: 16 2.6 Scope of work: 17 2.7 Research Methodology: 17 Chapter 3: Literature Review 18 3.1Resettlement and Rehabilitation Processes: 18 3.2 Legal framework for compensation and land acquisition: 18 3.3 Japan International Cooperation Involuntary Resettlement Policy: 20 3.4 The Entitlement Matrix: 21 3.5 Resettlement and Rehabilitation of Urban Poor: The story of Kanjur Marg 27 Chapter 4: System Study: 30 4.1Socio-Economic Impact Assessment: 30 4.2 Resettlement and Rehabilitation Activities: 31 Chapter 5: Present Scenario of Resettlement and Rehabilitation activities 37 5.1Resettlement and Rehabilitation process status (metro line alignment): 37 Chapter 6: Data Collection 39 6.1 Resettlement and Rehabilitation status (Vastral Gam to Appreal Park): 39 6.2 Selection of the stretch for the survey of PAF: 40 6.3 Issues of Project Affected People: Vastral Gam to Appreal Park: 43 6.4 Challenges faced by MEGA: 45 Chapter 7: Action Plan: Timeframe Matrix 48 7.1 Detailing of the Action plan: Issues of Project Affected Families 49 7.2 Detailing of the Action Plan: Issues of MEGA 51 7.3 Conclusion: 52 REFERENCES 53 ANNEXURES 55
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Collection Call number Status Date due Barcode Item holds
Thesis CEPT Library Faculty of Management MTM TH-0157 PAN Not for loan 020349
Total holds: 0

Contents
List of Abbreviations 6
ABSTRACT 7
Table of Contents 9
Chapter: 1 Introduction 11
1.1 Resettlement: 11
1.2 Rehabilitation: 11
1.3Resettlement and Rehabilitation in urban developmental projects: 11
1.4 Functions of Resettlement: 12
1.5 Reasons for Resettlement of people: 12
1.6 Issues related to Resettlement of people: 12
1.7 Objectives of Rehabilitation: 13
Chapter 2: Introduction to the Case Study: 14
2.1 Components of Resettlement and Rehabilitation (MEGA): 14
2.2 Stakeholder Mapping: 15
2.3 Problem Statement: 16
2.4 Aim of the Project: 16
2.5 Objectives of the Project: 16
2.6 Scope of work: 17
2.7 Research Methodology: 17
Chapter 3: Literature Review 18
3.1Resettlement and Rehabilitation Processes: 18
3.2 Legal framework for compensation and land acquisition: 18
3.3 Japan International Cooperation Involuntary Resettlement Policy: 20
3.4 The Entitlement Matrix: 21
3.5 Resettlement and Rehabilitation of Urban Poor: The story of Kanjur Marg 27
Chapter 4: System Study: 30
4.1Socio-Economic Impact Assessment: 30
4.2 Resettlement and Rehabilitation Activities: 31
Chapter 5: Present Scenario of Resettlement and Rehabilitation activities 37
5.1Resettlement and Rehabilitation process status (metro line alignment): 37
Chapter 6: Data Collection 39
6.1 Resettlement and Rehabilitation status (Vastral Gam to Appreal Park): 39
6.2 Selection of the stretch for the survey of PAF: 40
6.3 Issues of Project Affected People: Vastral Gam to Appreal Park: 43
6.4 Challenges faced by MEGA: 45
Chapter 7: Action Plan: Timeframe Matrix 48
7.1 Detailing of the Action plan: Issues of Project Affected Families 49
7.2 Detailing of the Action Plan: Issues of MEGA 51
7.3 Conclusion: 52
REFERENCES 53
ANNEXURES 55

There are no comments on this title.

to post a comment.
Excel To HTML using codebeautify.org Sheet Name :- Location Chart
Location Chart Basement 1 (B1) Class No. 600 - 649, 660 - 699
(B1) :Mezzanine 1 Class No. 700 - 728
(B1) :Mezzanine 2 Class No. 728.1 - 799, 650 - 659, Reference Books, Faculty work
Basement 2 (B2) Class No. 000 - 599, 800-999
Basement 3 (B3) (Please Inquire at the Counter for resources) Theses, Students' works, Bound Journals, Drawings, Atlas, Oversize Books, Rare Books, IS codes, Non-book Materials