Image from Google Jackets

Life cycle cost analysis for building

By: Contributor(s): Series: INSDAG Publication ; INS/PUB/129Publication details: Kolkata Institute for Steel Development & Growth (INSDAG) 2012Description: 93pSubject(s):
DDC classification:
  • 692.5 INSDAG
Contents:
Contents Table of contents Chapter 1 Introduction 1 Chapter 2 Theory 5 2.1 General 5 2.2 Symbols and notation 6 2.3 Standard practice of measuring LCC 15 2.3.1 General - objectives, alternatives and constraints 15 2.3.2 Data and Assumptions 15 2.3.3 Depreciation of currency & inflation 16 2.3.4 Depreciation of Immovable asset 16 2.3.5 Salvage value & replacement Value 18 2.3.6 Pay back period & yield 18 2.3.7 Determination of life expectancy of Buildings 19 2.3.8 Computation method of LCCA 22 2.3.9 Parameters of LCCA for buildings 26 2.3.10 Selection criteria of study period of LCCA 26 2.3.11 Precautions while calculating LCCA 26 2.4 Some examples 27 2.4.1 (G+3) Sroreyed residential buildings with strip foundation 28 2.4.2 (G+3) Sroreyed residential buildings with pile foundation 38 2.4.3 (G+6) Sroreyed residential buildings with pile foundation 48 2.4.4 (B+G+20) Sroreyed residential buildings with pile foundation 58 2.4.5 (3B+G+40) Sroreyed residential buildings with pile foundation 78 2.5 Comparison between LCCA of various options 85 Chapter 3 - Observations & Conclusion 91
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Collection Call number Status Date due Barcode Item holds
Book CEPT Library Faculty of Technology 692.5 INSDAG Available 017907
Total holds: 0

Contents
Table of contents
Chapter 1 Introduction 1
Chapter 2 Theory 5
2.1 General 5
2.2 Symbols and notation 6
2.3 Standard practice of measuring LCC 15
2.3.1 General - objectives, alternatives and constraints 15
2.3.2 Data and Assumptions 15
2.3.3 Depreciation of currency & inflation 16
2.3.4 Depreciation of Immovable asset 16
2.3.5 Salvage value & replacement Value 18
2.3.6 Pay back period & yield 18
2.3.7 Determination of life expectancy of Buildings 19
2.3.8 Computation method of LCCA 22
2.3.9 Parameters of LCCA for buildings 26
2.3.10 Selection criteria of study period of LCCA 26
2.3.11 Precautions while calculating LCCA 26
2.4 Some examples 27
2.4.1 (G+3) Sroreyed residential buildings with strip foundation 28
2.4.2 (G+3) Sroreyed residential buildings with pile foundation 38
2.4.3 (G+6) Sroreyed residential buildings with pile foundation 48
2.4.4 (B+G+20) Sroreyed residential buildings with pile foundation 58
2.4.5 (3B+G+40) Sroreyed residential buildings with pile foundation 78
2.5 Comparison between LCCA of various options 85
Chapter 3 - Observations & Conclusion 91

There are no comments on this title.

to post a comment.
Excel To HTML using codebeautify.org Sheet Name :- Location Chart
Location Chart Basement 1 (B1) Class No. 600 - 649, 660 - 699
(B1) :Mezzanine 1 Class No. 700 - 728
(B1) :Mezzanine 2 Class No. 728.1 - 799, 650 - 659, Reference Books, Faculty work
Basement 2 (B2) Class No. 000 - 599, 800-999
Basement 3 (B3) (Please Inquire at the Counter for resources) Theses, Students' works, Bound Journals, Drawings, Atlas, Oversize Books, Rare Books, IS codes, Non-book Materials