Image from Google Jackets

Implementing Agile project management (SCRUM) approach in the development of building projects (Also available on CD)

By: Contributor(s): Material type: TextTextPublication details: 2018Description: i,3,9,xiii,49p.,CD-ROMDDC classification:
  • B TH-0744 PAR
Contents:
CONTENTS 1 INTRODUCTION 1 1.1 BACKGROUND 1 1.1.1 AGILE PROJECT MANAGEMENT 1 1.2 NEED FOR STUDY 2 1.3 OBJECTIVE 2 1.4 PURPOSE 2 1.5 SCOPE OF WORK 2 1.6 STUDY TIMELINE 3 1.7 RESEARCH QUESTION 3 2 LITERATURE SURVEY 5 2.1 PROJECT MANAGEMENT BOOK OF KNOWLEDGE: 5 2.2 TRADITIONAL/WATERFALL PROJECT MANAGEMENT: 5 2.3 SCRUM 6 2.3.1 INTRODUCTION 6 2.3.2 HISTORY 6 2.3.3 OVERVIEW 6 2.3.4 SCRUM ROLES 7 2.3.5 SCRUM ARTIFACTS 7 2.3.6 SCRUM PROCESSES 8 2.4 SUMMARY OF LITERATURE REVIEW: 9 3 RESEARCH METHODOLOGY 11 3.1 CHOSEN RESEARCH METHOD 11 3.2 REFLECTION OF CHOSEN METHOD 11 3.3 DATA 11 3.4 QUESTIONNAIRE SURVEY 11 3.5 CHOICES OF RESPONDENTS 12 3.6 CASE STUDY 12 3.7 PSP PROJECTS LTD. 12 3.8 RESEARCH ETHICS 12 4 DATA COLLECTION 13 4.1 QUESTIONNARE SURVEY FORM 13 4.1.1 RESPONDENT’S PERSONAL DETAILS 13 4.1.2 PROJECT DETAILS 13 4.1.3 SCRUM SURVEY 13 4.2 DATA COLLECTION FROM CASE STUDIES 14 4.2.1 CASE STUDY DETAILS 14 4.2.2 LIST OF DATA AVAILABLE 17 4.2.3 LIST OF FORMATS AVAILABLE 17 5 DATA ANALYSIS 19 5.1 QUESTIONNAIRE RESPONSES 19 5.1.1 RESPONSES FOR 7 FACTORS 20 5.1.2 AVERAGE FACTOR ANALYSIS 23 5.2 ANALYSIS OF CASE STUDIES 24 5.2.1 BURN-DOWN CHART 24 5.2.2 PERCENT DELAY 27 5.3 PREDICTIVE VS. ADAPTIVE PROCESS 28 5.4 COMPLEXITY OF PROJCETS TO IMPLEMENT SCRUM 29 5.5 ROADBLOCKS/DRAWBACKS OF AGILE PROJECT MANAGEMENT APPROACH IN CONSTRUCTION INDUSTRY 30 6 CONCLUSION 33 6.1 RESEARCH QUESTIONS 33 6.2 ANSWERS 33 6.3 RECOMMENDATIONS 34 7 FUTURE RESEARCH AREAS 35 8 LIST OF ANNEXURES 37 8.1 ANNEXURE 1 37 8.2 ANNEXURE 2 43 8.3 ANNEXURE 3 44 8.4 ANNEXURE 4 45 8.5 ANNEXURE 5 46 8.6 ANNEXURE 6 48 9 REFERENCES 49 9.1 LITERATURE 49
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Collection Call number Status Date due Barcode Item holds
Thesis CEPT Library Faculty of Technology B TH-0744 PAR Not for loan 019801
Total holds: 0

CONTENTS
1 INTRODUCTION 1
1.1 BACKGROUND 1
1.1.1 AGILE PROJECT MANAGEMENT 1
1.2 NEED FOR STUDY 2
1.3 OBJECTIVE 2
1.4 PURPOSE 2
1.5 SCOPE OF WORK 2
1.6 STUDY TIMELINE 3
1.7 RESEARCH QUESTION 3
2 LITERATURE SURVEY 5
2.1 PROJECT MANAGEMENT BOOK OF KNOWLEDGE: 5
2.2 TRADITIONAL/WATERFALL PROJECT MANAGEMENT: 5
2.3 SCRUM 6
2.3.1 INTRODUCTION 6
2.3.2 HISTORY 6
2.3.3 OVERVIEW 6
2.3.4 SCRUM ROLES 7
2.3.5 SCRUM ARTIFACTS 7
2.3.6 SCRUM PROCESSES 8
2.4 SUMMARY OF LITERATURE REVIEW: 9
3 RESEARCH METHODOLOGY 11
3.1 CHOSEN RESEARCH METHOD 11
3.2 REFLECTION OF CHOSEN METHOD 11
3.3 DATA 11
3.4 QUESTIONNAIRE SURVEY 11
3.5 CHOICES OF RESPONDENTS 12
3.6 CASE STUDY 12
3.7 PSP PROJECTS LTD. 12
3.8 RESEARCH ETHICS 12
4 DATA COLLECTION 13
4.1 QUESTIONNARE SURVEY FORM 13
4.1.1 RESPONDENT’S PERSONAL DETAILS 13
4.1.2 PROJECT DETAILS 13
4.1.3 SCRUM SURVEY 13
4.2 DATA COLLECTION FROM CASE STUDIES 14
4.2.1 CASE STUDY DETAILS 14
4.2.2 LIST OF DATA AVAILABLE 17
4.2.3 LIST OF FORMATS AVAILABLE 17
5 DATA ANALYSIS 19
5.1 QUESTIONNAIRE RESPONSES 19
5.1.1 RESPONSES FOR 7 FACTORS 20
5.1.2 AVERAGE FACTOR ANALYSIS 23
5.2 ANALYSIS OF CASE STUDIES 24
5.2.1 BURN-DOWN CHART 24
5.2.2 PERCENT DELAY 27
5.3 PREDICTIVE VS. ADAPTIVE PROCESS 28
5.4 COMPLEXITY OF PROJCETS TO IMPLEMENT SCRUM 29
5.5 ROADBLOCKS/DRAWBACKS OF AGILE PROJECT MANAGEMENT APPROACH IN CONSTRUCTION INDUSTRY 30
6 CONCLUSION 33
6.1 RESEARCH QUESTIONS 33
6.2 ANSWERS 33
6.3 RECOMMENDATIONS 34
7 FUTURE RESEARCH AREAS 35
8 LIST OF ANNEXURES 37
8.1 ANNEXURE 1 37
8.2 ANNEXURE 2 43
8.3 ANNEXURE 3 44
8.4 ANNEXURE 4 45
8.5 ANNEXURE 5 46
8.6 ANNEXURE 6 48
9 REFERENCES 49
9.1 LITERATURE 49

There are no comments on this title.

to post a comment.
Excel To HTML using codebeautify.org Sheet Name :- Location Chart
Location Chart Basement 1 (B1) Class No. 600 - 649, 660 - 699
(B1) :Mezzanine 1 Class No. 700 - 728
(B1) :Mezzanine 2 Class No. 728.1 - 799, 650 - 659, Reference Books, Faculty work
Basement 2 (B2) Class No. 000 - 599, 800-999
Basement 3 (B3) (Please Inquire at the Counter for resources) Theses, Students' works, Bound Journals, Drawings, Atlas, Oversize Books, Rare Books, IS codes, Non-book Materials