Image from Google Jackets

Current practices to set and monitor dbe goals on design-build projects and other alternative project delivery methods : a synthesis of highway practice

By: Material type: TextTextSeries: National cooperative highway research program, NCHRP synthesis ; No.481Publication details: Washington D.C. Transportation Research Board 2015Description: viii,128pISBN:
  • 9780309271912
Subject(s):
DDC classification:
  • 388.4 T.R.B.
Online resources:
Contents:
CONTENTS SUMMARY 1 CHAPTER ONE INTRODUCTION 5 Types of Alternative Delivery Method Projects, 5 Federal Regulations, 6 Study Approach, 8 Limitations, 9 Overview of the Report, 9 Chapter Summary, 9 CHAPTER TWO USE OF ALTERNATIVE DELIVERY METHODS BY STATE DEPARTMENTS OF TRANSPORTATION 10 Design-Build, 10 Public-Private Partnerships, 10 Construction Manager at Risk and Construction Manager/General Contractor, 11 Chapter Summary, 11 CHAPTER THREE APPLICATION OF TRADITIONAL DISADVANTAGED BUSINESS ENTERPRISE CONTRACT GOALS TO ALTERNATIVE DELIVERY METHOD PROJECTS 12 Examples of States Applying Traditional Methods, 12 Applying Disadvantaged Business Enterprise Contract Goals Using Traditional Methods, 14 Chapter Summary, 20 CHAPTER FOUR NEW APPROACHES FOR APPLYING DISADVANTAGED BUSINESS ENTERPRISE CONTRACT GOALS 2 Barriers That Emerged with Application of Traditional Approach to Design-Build, 21 Summary of New Approaches, by Stage, 22 Chapter Summary, 33 CHAPTER FIVE APPROACHES TO APPLYING DISADVANTAGED BUSINESS ENTERPRISE GOALS TO CONSTRUCTION MANAGER AT RISK AND CONSTRUCTION MANAGER/GENERAL CONTRACTOR METHODS State Departments of Transportation That Use Traditional Application of Disadvantaged Business Enterprise ContractGoals, 35 State Departments of Transportation That Use New Approaches to Disadvantaged Business Enterprise Contract Goals, 36 Other States, 39 Feedback from the Contracting Industry, 3 9 Feedback from FHWA Staff, 39 CHAPTER SIX CONCLUSIONS Summary of Results, 40 Barriers to Widespread Implementation of New Methods, 40 Suggestions for Further Research, 40 GLOSSARY OF TERMS AND ACRONYMS 42 REFERENCES 44 BIBLIOGRAPHY 46 APPENDIX A STRUCTURED TELEPHONE INTERVIEW GUIDE FOR STATE DEPARTMENTS OF TRANSPORTATION 50 APPENDIX B SAMPLE RFP LANGUAGE FOR DBE CONTRACT GOALS FOR DESIGN-BUILD (NORTH CAROLINA DEPARTMENT OF TRANSPORTATION DESIGN-BUILD PROJECT FROM 2013) 53 APPENDIX C SAMPLE DBE PLAN SUBMITTED BY PROPOSER IN RESPONSE TO A DESIGN-BUILD RFP (TEXAS DEPARTMENT OF TRANSPORTATION DESIGN-BUILD PROJECT FROM 2013) 63 APPENDIX D SAMPLE DBE AND WORKFORCE/EEO PROJECT PLANS SUBMITTED BY PROPOSERS IN RESPONSE TO A DESIGN-BUILD RFP (THE LOUISVILLE-SOUTHERN INDIANA OHIO RIVER BRIDGES PROJECT, A COLLABORATION BETWEEN THE KENTUCKY TRANSPORTATION CABINET AND INDIANA DOT) 77 APPENDIX E VIRGINIA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISIONS PERTAINING TO DBE PROGRAM FOR DESIGN-BUILD 88 APPENDIX F MINNESOTA DOT DISADVANTAGED BUSINESS ENTERPRISE (DBE) SPECIAL PROVISIONS FOR DESIGN-BUILD PROJECTS 101
List(s) this item appears in: BOOKS AND STUDY MATERIAL ON HIGHWAY ENGINEERING AND TOLL PRICING
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Collection Call number Status Date due Barcode Item holds
Book CEPT Library Faculty of Planning 388.4 T.R.B. Available 014449
Total holds: 0

CONTENTS
SUMMARY 1
CHAPTER ONE INTRODUCTION 5
Types of Alternative Delivery Method Projects, 5
Federal Regulations, 6
Study Approach, 8
Limitations, 9
Overview of the Report, 9
Chapter Summary, 9
CHAPTER TWO USE OF ALTERNATIVE DELIVERY METHODS BY STATE DEPARTMENTS OF TRANSPORTATION 10
Design-Build, 10
Public-Private Partnerships, 10
Construction Manager at Risk and Construction Manager/General Contractor, 11
Chapter Summary, 11
CHAPTER THREE APPLICATION OF TRADITIONAL DISADVANTAGED BUSINESS ENTERPRISE CONTRACT GOALS TO ALTERNATIVE DELIVERY METHOD PROJECTS 12
Examples of States Applying Traditional Methods, 12
Applying Disadvantaged Business Enterprise Contract Goals Using Traditional Methods, 14
Chapter Summary, 20
CHAPTER FOUR NEW APPROACHES FOR APPLYING DISADVANTAGED BUSINESS ENTERPRISE CONTRACT GOALS 2
Barriers That Emerged with Application of Traditional Approach to Design-Build, 21
Summary of New Approaches, by Stage, 22
Chapter Summary, 33
CHAPTER FIVE APPROACHES TO APPLYING DISADVANTAGED BUSINESS ENTERPRISE GOALS TO
CONSTRUCTION MANAGER AT RISK AND CONSTRUCTION MANAGER/GENERAL CONTRACTOR METHODS
State Departments of Transportation That Use Traditional Application of Disadvantaged Business Enterprise ContractGoals, 35
State Departments of Transportation That Use New Approaches to Disadvantaged Business Enterprise Contract Goals, 36
Other States, 39
Feedback from the Contracting Industry, 3 9
Feedback from FHWA Staff, 39
CHAPTER SIX CONCLUSIONS Summary of Results, 40
Barriers to Widespread Implementation of New Methods, 40
Suggestions for Further Research, 40
GLOSSARY OF TERMS AND ACRONYMS 42
REFERENCES 44
BIBLIOGRAPHY 46
APPENDIX A STRUCTURED TELEPHONE INTERVIEW GUIDE FOR STATE DEPARTMENTS OF TRANSPORTATION 50
APPENDIX B SAMPLE RFP LANGUAGE FOR DBE CONTRACT GOALS FOR DESIGN-BUILD
(NORTH CAROLINA DEPARTMENT OF TRANSPORTATION DESIGN-BUILD PROJECT FROM 2013) 53
APPENDIX C SAMPLE DBE PLAN SUBMITTED BY PROPOSER IN RESPONSE TO A DESIGN-BUILD RFP (TEXAS DEPARTMENT OF TRANSPORTATION DESIGN-BUILD PROJECT FROM 2013) 63
APPENDIX D SAMPLE DBE AND WORKFORCE/EEO PROJECT PLANS SUBMITTED BY
PROPOSERS IN RESPONSE TO A DESIGN-BUILD RFP (THE LOUISVILLE-SOUTHERN INDIANA OHIO RIVER BRIDGES PROJECT, A COLLABORATION BETWEEN THE KENTUCKY TRANSPORTATION CABINET AND INDIANA DOT) 77
APPENDIX E VIRGINIA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISIONS PERTAINING TO DBE PROGRAM FOR DESIGN-BUILD 88
APPENDIX F MINNESOTA DOT DISADVANTAGED BUSINESS ENTERPRISE (DBE) SPECIAL PROVISIONS FOR DESIGN-BUILD PROJECTS 101




There are no comments on this title.

to post a comment.
Excel To HTML using codebeautify.org Sheet Name :- Location Chart
Location Chart Basement 1 (B1) Class No. 600 - 649, 660 - 699
(B1) :Mezzanine 1 Class No. 700 - 728
(B1) :Mezzanine 2 Class No. 728.1 - 799, 650 - 659, Reference Books, Faculty work
Basement 2 (B2) Class No. 000 - 599, 800-999
Basement 3 (B3) (Please Inquire at the Counter for resources) Theses, Students' works, Bound Journals, Drawings, Atlas, Oversize Books, Rare Books, IS codes, Non-book Materials