Your search returned 9 results.

Sort
Results
Reduction of through put time (TPT) in electrotherm (India) ltd. by using value stream mapping (VSM) in production shop floor-panel shop by
Material type: Text Text
Publication details: 2012
Availability: Items available for reference: CEPT Library: Not for loan (1)Call number: MTM TH-0022 THA.

Developing competitiveness in MSME unit with the help of lean management tools : a case study of brass stopper manufacturing unit, Jamnagar by
Material type: Text Text
Publication details: 2012
Availability: Items available for reference: CEPT Library: Not for loan (1)Call number: MTM TH-0025 PAT.

Integrating traditional project management with lean management tools : step forward in residential project by developers by
Material type: Text Text
Publication details: 2012
Availability: Items available for reference: CEPT Library: Not for loan (1)Call number: MTM TH-0028 GOY.

Analysis of implementation and interdependence of lean tools and ERP systems for global competitiveness in Indian manufacturing segment by
Material type: Text Text
Publication details: 2012
Availability: Items available for reference: CEPT Library: Not for loan (1)Call number: MTM TH-0033 JUN.

Impact of 5s implementation on different variables of organizational dynamics in indian manufacturing context by
Material type: Text Text
Publication details: 2012
Availability: Items available for reference: CEPT Library: Not for loan (1)Call number: MTM TH-0035 VOR.

Analysis of influencers in transition to best in class inventory management strategies in upstream supply chain of indian manufacturing sector by
Material type: Text Text
Publication details: 2012
Availability: Items available for reference: CEPT Library: Not for loan (1)Call number: MTM TH-0039 PUR.

Market potential for solar water pumping system and cost benefit analysis of diesel vs. solar pump (Also available on CD) by
Material type: Text Text
Publication details: 2014
Availability: Items available for reference: CEPT Library: Not for loan (1)Call number: MTM TH-0090 KOV.

Standardization of machine assembly time of shuttle looms machine : a case study at dynamic autolooms India Pvt. Ltd. (Also available on CD) by
Material type: Text Text
Publication details: 2014
Availability: Items available for reference: CEPT Library: Not for loan (1)Call number: MTM TH-0094 PAT.

Lean management in healthcare services : a case study of Sarkhej CHC (Also available on CD) by
Material type: Text Text
Publication details: 2017
Availability: Items available for reference: CEPT Library: Not for loan (1)Call number: MTM TH-0147 PRA.

Pages
Excel To HTML using codebeautify.org Sheet Name :- Location Chart
Location Chart Basement 1 (B1) Class No. 600 - 649, 660 - 699
(B1) :Mezzanine 1 Class No. 700 - 728
(B1) :Mezzanine 2 Class No. 728.1 - 799, 650 - 659, Reference Books, Faculty work
Basement 2 (B2) Class No. 000 - 599, 800-999
Basement 3 (B3) (Please Inquire at the Counter for resources) Theses, Students' works, Bound Journals, Drawings, Atlas, Oversize Books, Rare Books, IS codes, Non-book Materials