TY - BOOK TI - Akalank's construction specifications for government contractors specifications civil works. Vol.1 : general, carriage of materials and earth work. Vol.2 : motars, concrete, reinforced cement concrete work, Brick work, stone work and marble work. Vol.3 : wood work, steel work and flooring. Vol.4 : roofing, finishing, repairs to buildings, dismantling and demolition and miscellaneous building works. Vol.5 : road work, horticulture and land scaping. Vol.6 : sanitary installations, water supply, drainage and miscellanceous U1 - 624.0212 PY - 2002/// CY - Delhi PB - Akaland Publications N1 - LIST OF INDIAN STANDARDS 1 0.GENERAL 0.1. 2 0,2. 2 0.3 Interpretations 2 0.4. Definitions 2 0.5. Floor and levels 2 0.6.Foundation and plinth 3 0.7. Measurements 3 0.8. Materials 3 0.9. Safety in Construction 4 0.10. Abbreviations 4 Appendix A : List of Materials Bearing ISI Certification Mark 5 Appendix 8 : List of Approved Products by Central Products Evaluation Committee CPWD 7 1.CARRIAGE OF MATERIALS 1.0 General 12 1.1 Responsibility for Loss or Damage 12 1.2 Mode of Carriage 12 1.3 Lead 12 1.4 Stacking ' 12 1.5 Measurements 12 1.6 Rate 12 2.EARTH WORK 2.0 Definitions 13 2.1 Classification ot Soils 13 2.2 Antiquities and Useful Materials 13 2.3 Protections 13 2.4 Site Clearance 14 2.5 Setting out and Making Profiles 14 2.6 Blasting 14 2.7 Excavation in All Kinds of Soils 16 2.8 Excavation in Ordinary/Hard Rock 16 2.9 Filling 17 2.10Measurements 17 2.11Rates 18 2.12Surface Excavation 18 2.13Rough Excavation & Filling18 2.14Excavation over Area (All Kinds of Soil) ] 18 2.15Excavation over Area (Ordinary/Hard Rock) 19 2.16Excavation in Trenches for Foundations and Drains (All Kinds of Soil) 19 2.17Excavation in Trenches for Foundation and Drains (Ordinary/Hard Rock) 19 2.18Excavation in Trenches for Pipes, Cables etc. and Refilling 19 2.19Planking and Strutting 20 2.20Excavation in Water, Mud or Foul Position 21 2.21Filling in Trenches, Plinth, Under Floor etc. 22 2.22Sand Filling in Plinth22 2.23Surface Dressing 22 2.24Jungle Clearance 22 2.25Felling Trees 23 2.26Anti Termite Treatment 23 Fig. 1 : Type Design for Temporary Site Bench Mark 27 Fig. 2 : Close and Open Planking and Strutting 28 Fig. 3 : Anti-termite Treatment (Pre-constructional 28 ER -