TY - GEN TI - Facilities management of a multistoried residential and commercial complex, Indraprasth towers U1 - 799.9-SR PY - 2019/// CY - Ahmedabad PB - Faculty of Management, CEPT University KW - N1 - Contents Foreword v Acknowledgement Vii Abbrevi ations Viii Executive Summary ix Introduction to Facilities Management 1 Methodology, Objective, Scope, Limitations 3 Introduction to Facilities 5 Components of FM A.Governance A1. Existing Scenario 09 Al.l. Introduction A1.2. Legislation, Policies and Guidelines A 1.3. System Description and Processes A l.4. Human Resource A 1.5. Finances B. Parking B1..Existing Scenario 17 B 1.1. Introduction B 1.2. Legislations B 1.3. System description B2. Assessments 19 B2.1 Comparative Analysis B2.2 Survey Analysis B2.3 Issue Identification B3. Proposals 27 B3 .1 Alternative Proposals B3 .2 Recommendations and detailed proposals C. Solid waste management C1.Existing Scenario 43 C1.1 lntroduction C1.2 Legislation Policies and Guidelines C1.3 System Description C2. Assessments 49 C2.1 Survey Analysis C2.2 Issue Identification C3. Proposals 57 C3.1 Alternative propsals C3.2 Analysis C3.3 Recommendations / Detailed Proposal D.Water supply D1. Existing Scenario 71 D 1.1. Introduction D2.2. Legislations, Guidelines and Nonns D1.3. System Description and Processes D2. Assessments 77 D2.1. Comparative analysis D2.2. Survey Analysis D3. Proposals 82 D3 .1. Residential D3.2. Commercial E.Drainage E1. Existing scenario 93 E 1.1 Introduction E1.2 Legislations E1.3 System Description and Processes E 1.4 Drainage System Details E2. Assessments 97 E2.1 Comparative Analysis E2.2 Issue Identification E3. Proposals 100 E3. 1 Alternative Proposals E3.2 Analysis E3.3 Recommendations F.Street lights F1. Existing Scenario 121 F1.1 Introduction F1.2 Legislations, Guidelines and Norms F1.3 System Description and Processes F2. Assessments 125 F2.1 Comparative analysis F2.2 Survey Analysis F3. Proposals 130 F3.1 Phase 1: Repair of Existing Lamp Fixtures F3.2 Phase 2: Repair of Broken Luminaire Fixtures F3.3 Phase 3 : Remove and Replace Lamp Fixtures Which are not as per Standards F3.4 Phase 4: Installation of Energy Efficient Luminaire Fixtures for Dark Areas F3.5 Phase 5: Maintenance Regime G. Landscape G1 Existing Scenario 139 G1.1 Introduction G1.2 Legislations, Guidelines and Norms G1.3 System Description and Processes 2. Assessments 143 G2.1 Survey Analysis G3.Proposals 146 G3.1 Green Roof G3.2 Green Facade G3.3 Green Wall G3.4 Comparative analysis and Management Phases G3.5 Maintenance and Supervision Check Sheet H. Lift maintenance H1.Existing Scenario 155 H1.l. Introduction H1.2.Legislation H1.3 System descriptions and processes H2.Assessment 158 H2.1. Comparative analysis H2.2. Survey Analysis H2.3. Issue identification H3.Proposals 160 H3.1 Alternative Proposal H3.2 Proposals analysis (refer Annexure for contract details) I.Housekeeping I1 Existing Scenario 163 I1.1 Introduction I1.2 Legislation: I1.3 System Description and Processes I2. Assessments 169 I2.1 Comparative Analysis: I2.2 Survey analysis of Housekeeping: I2.3 Issue identification: I3. Proposals 173 I3.1 Alternative proposals: J. Fire safety and security J1. Existing scenario 181 J 1.1 Introduction J1.2 Legislations J1.3 System description and processes J2. Assessments 189 J2.1 Survey analysis J2.2 Issue identification J3. Proposals 194 J3.1 Alternative proposals K.Governance - II K1. Assessment 211 K1.1 Complaint redressal System (Residential) K1.2 Asset Inventory Records (Residential) K1.3 Ineffective Managing Committee (Commercial) K2. Proposal 213 K2.1 Asset Inventory Management System K2.2 Society Management System K2.3 Restructure the Governance Structure FMl Plan 222 List of Figures 224 List of Tables 227 Bibliograpgy 229 Annexures 232 ER -