TY - BOOK AU - Pratap, Mayuresh (PT101216) AU - Sanghvi, Amar (Guide) TI - Study of cost factor that affect a construction project (Softcopy is also available) U1 - CPM TH-0315 PY - 2018/// N1 - Contents Acknowledgements iii Abstract iv List of figures v List of tables vi 1. Introduction 1 2. Need for study 3 3. Objective 5 4. Scope of study 5 5. Research methodolgy 6 5.1. Literature review 6 5.2. Data collection & analysis 6 6. Literature review 7 6.1. Introduction 7 6.2. Review 7 7. Interview Question 27 8. Thesis Schedule 29 9. Data Collection & Analysis 31 9.1. Introduction 31 9.2. Quantitative Data Collection & Analysis 31 9.2.1.Data Collection for Quantitative Analysis 31 9.2.2.Quantitative Data Analysis 32 9.2.3.Validity and reliability of questionnaire survey 38 9.3. Qualitative data collection & analysis 47 9.3.1.Qualitative data collection 47 9.3.2.Qualitative data analysis 48 9.4. Result Summary 49 9.5. Comparison with previous study 52 10. Conclusion 53 11. Future Scope 54 References 55 Annexures A 56 Annexures B 64 ER -