TY - BOOK AU - Shukla, Shubham (UC6513) AU - Patel, Jitendra (Guide) TI - Risk identification and risk assessment for the cable stayed bridge projects (Also available on CD) U1 - B TH-0772 PY - 2018/// N1 - CONTENTS 1. THESIS BRIEF 1 1.1 INTRODUCTION 1 1.2 NEED OF THE STUDY 1 1.3 OBJECTIVE OF THE THESIS 1 1.4 SCOPE OF WORK 2 1.5 METHODOLOGY FOR STUDY 2 1.6 LIMITATIONS 2 1.7 THESIS SCHEDULE 3 2. LITERATURE STUDY 4 2.1 BACKGROUND 4 2.2 NEED OF RISK ASSESSMENT IN THE SECTOR OF CABLE STAYED BRIDGE PROJECTS: 5 2.3 RISK & RISK ASSESSMENT 6 2.4 RISK MANAGEMENT VS RISK ASSESSMENT 7 2.5 RISK ASSESSMENT 7 3. DATA COLLECTION 11 3.1 RISK IDENTIFICATION 11 3.2 METHODS FOR DATA COLLECTION 14 3.3 EXPERT OPEN INTERVIEWS 14 3.3.1 INTERVIEW QUESTIONS 14 3.3.2 LIST OF EXPERTS FOR OPEN INTERVIEWS 14 3.3.3 DATA COLLECTION OF EXPERT OPEN INTERVIEWS 15 3.4 DETAILS OF THE CASE STUDIES TAKEN 17 3.4.1 SELECTION CRITIRIA FOR THE CASE STUDIES 17 3.4.2 CASE STUDIES TAKEN 17 3.4.3 DATA COLLECTION FROM THE CASE STUDIES 18 3.5 QUESTIONNAIRE SURVEY 19 3.5.1 INFORMATION OF THE RESPONDENTS 20 4. DATA ANALYSIS 21 4.1 DATA ANALYSIS METHOD 21 4.2 RELIABILITY & VALIDITY OF THE DATA 22 4.3 RISK RANKING BASED ON RII METHOD 23 4.3.1 RISK RANKING BASED ON RII OF IMPACT OF THE RISKS 23 4.3.2 RISK RANKING BASED ON RII OF PROBABILITY OF OCCURRENCE OF THE RISKS 26 4.3.3 RISK RANKING BASED ON RII OF THE PRODUCT OF IMPACT & PROBABILITY OF OCCURRENCE THE RISKS 29 4.4 RISK MITIGATION 31 5. CONCLUSION 33 FUTURE SCOPE OF STUDY 34 REFERENCES 35 APPENDICES 36 APPENDIX 1 – QUESTIONNAIRE 36 APPENDIX 2 – RESPONSES OF THE QUESTIONNAIRE 42 RESPONSES OF THE QUESTIONNAIRE BASED ON IMPACT OF THE RISK 42 RESPONSES OF THE QUESTIONNAIRE BASED ON PROBABILITY OF OCCURRENCE OF THE RISK 45 ER -