TY - BOOK AU - Patel, Krupal (UC3713) AU - Shah, Reshma (Guide) TI - Role of project coordination in construction project (Mahatma Mandir - phase 2B) (Also available on CD) U1 - B TH-0751 PY - 2018/// N1 - CONTENTS Acknowledgement i Abstract Index of Tables vi Index of Figuresvii List of abbreviations:viii Chapter: 1 INTRODUCTION: 1 1.1 Background:1 1.2 Need for the study 1 1.3 Objectives:1 1.4 Scope of study:2 1.5 Research Methodology:2 1.6 Research Timeline:3 1.7 Limitations:3 Chapter 2 LITERATURE REVIEW 4 2.1 Introduction to Project Coordination: 4 2.2 Indian Scenario:4 2.3 Critical success factors for a project: 5 2.4 Key role of Project coordinator: 6 2.5 Coordination methods: 7 2.6 Coordination activities: 8 Chapter 3 DATA COLLECTION9 3.1 Methodology for study:9 3.2 Introduction to case study – Mahatma Mandir, Gandhinagar: 9 3.3 Introduction to Phase – 2B (Internal museum structure):11 3.4 Professional advisor’s scope of work:13 3.5 Coordination activity matrix: 14 3.6 Identification of critical issues: 15 3.7 Issue 1 – Bid process management: 17 3.8 Issue 2: Design issues and management: 26 3.9 Issue 3: DBR Approvals: 35 3.10 Issue 4: Study of estimates: 41 3.11 Issue 5: Approval of BOQ: 50 Chapter 4 DATA ANALYSIS 56 4.1 Analysis and findings of issues: 56 4.2 Opinion survey analysis: 65 Chapter 5 CONCLUSION 73 5.1 Overview 73 5.2 Learnings from major issues: 73 5.3 Learnings from qualitative opinion survey with client /contractor /consultant: 74 Chapter 6 SUGGESTIONS 75 6.1 Suggestions: 5 6.2 Future scope of study: 75 7 REFERENCES i 8 ANNEXURES: ii ER -