Image from Google Jackets

Enhancing lean construction management with conversational Agents (Softcopy is also available)

By: Contributor(s): Material type: TextTextPublication details: 2024Description: xvi,49pDDC classification:
  • CEM TH-0451 MOH
Contents:
TABLE OF CONTENTS ABSTRACT i UNDERTAKING iii CERTIFICATE v ACKNOWLEDGEMENTS vii ABBREVIATIONS ix TABLE OF CONTENTS xi LIST OF FIGURES xiii LIST OF TABLES xv CHAPTER-1: INTRODUCTION 1 CHAPTER-2: LITERATURE REVIEW 3 2.1 Research Background 3 2.2 Research Gap/Need 6 CHAPTER-3: Research Objectives 9 3.1 Research Methodology 10 CHAPTER-4: Data Collection 11 4.1 Current State of Construction Industry 11 4.2 Current State of Lean Construction Management 12 4.2.1 Case Study 13 4.3 Capabilities of AI Chatbot 15 4.4 Last Planner System 17 4.4.1 Implementation of LPS 17 4.4.2 Site Visit 18 4.4.3 Benefits of LPS 21 4.4.4 Disadvantages of LPS 22 4.5 Types of AI Chatbot Available 24 4.5.1 ChatGPT 3.5 24 4.5.2 Jasper AI 25 4.5.3 Perpexlity AI 27 4.5.4 Google Gemini 28 4.5.5 Microsoft Bing 30 4.5.6 Claude 3 Sonnet 32 4.6 Prompt Engineering 33 CHAPTER-5: Data Analysis 35 5.1 Possible Usecases 35 5.1.1 Phase Planning 35 5.1.2 Look Ahead Planning 36 5.1.3 Commitment Planning 37 5.1.4 Production Management 38 5.1.5 Measurement, Learning & Continual Improvement 39 5.1.6 First Run Studies 39 5.2 Result 40 5.2.1 Challenges for Implementation of conversational AI chatbot 40 5.2.2 Benefits of Implementation of conversational AI chatbot 41 5.2.3 Step wise use case 42 CHAPTER-6: Conclusion 45 REFERENCES 47
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Collection Call number Status Date due Barcode Item holds
Thesis CEPT Library Faculty of Technology CEM TH-0451 MOH Not For Loan 026660
Total holds: 0

TABLE OF CONTENTS
ABSTRACT i
UNDERTAKING iii
CERTIFICATE v
ACKNOWLEDGEMENTS vii
ABBREVIATIONS ix
TABLE OF CONTENTS xi
LIST OF FIGURES xiii
LIST OF TABLES xv
CHAPTER-1: INTRODUCTION 1
CHAPTER-2: LITERATURE REVIEW 3
2.1 Research Background 3
2.2 Research Gap/Need 6
CHAPTER-3: Research Objectives 9
3.1 Research Methodology 10
CHAPTER-4: Data Collection 11
4.1 Current State of Construction Industry 11
4.2 Current State of Lean Construction Management 12
4.2.1 Case Study 13
4.3 Capabilities of AI Chatbot 15
4.4 Last Planner System 17
4.4.1 Implementation of LPS 17
4.4.2 Site Visit 18
4.4.3 Benefits of LPS 21
4.4.4 Disadvantages of LPS 22
4.5 Types of AI Chatbot Available 24
4.5.1 ChatGPT 3.5 24
4.5.2 Jasper AI 25
4.5.3 Perpexlity AI 27
4.5.4 Google Gemini 28
4.5.5 Microsoft Bing 30
4.5.6 Claude 3 Sonnet 32
4.6 Prompt Engineering 33
CHAPTER-5: Data Analysis 35
5.1 Possible Usecases 35
5.1.1 Phase Planning 35
5.1.2 Look Ahead Planning 36
5.1.3 Commitment Planning 37
5.1.4 Production Management 38
5.1.5 Measurement, Learning & Continual Improvement 39
5.1.6 First Run Studies 39
5.2 Result 40
5.2.1 Challenges for Implementation of conversational AI chatbot 40
5.2.2 Benefits of Implementation of conversational AI chatbot 41
5.2.3 Step wise use case 42
CHAPTER-6: Conclusion 45
REFERENCES 47

There are no comments on this title.

to post a comment.
Excel To HTML using codebeautify.org Sheet Name :- Location Chart
Location Chart Basement 1 (B1) Class No. 600 - 649, 660 - 699
(B1) :Mezzanine 1 Class No. 700 - 728
(B1) :Mezzanine 2 Class No. 728.1 - 799, 650 - 659, Reference Books, Faculty work
Basement 2 (B2) Class No. 000 - 599, 800-999
Basement 3 (B3) (Please Inquire at the Counter for resources) Theses, Students' works, Bound Journals, Drawings, Atlas, Oversize Books, Rare Books, IS codes, Non-book Materials