Leveraging eco-budgeting for a circular economy transition - a case of Thrissur city (Softcopy is also available)
Material type: TextPublication details: 2024Description: 40pDDC classification:- MUM TH-0282 JOS
Item type | Current library | Collection | Call number | Status | Date due | Barcode | Item holds | |
---|---|---|---|---|---|---|---|---|
Thesis | CEPT Library | Faculty of Management | MUM TH-0282 JOS | Not For Loan | 026460 |
Table of Contents
Declaration 3
List of Figures 5
List of Abbreviation 6
Abstract 7
Chapter: 1 Introduction 9
1.1. Rationale for Study 10
Chapter 2: Literature Review 12
2.1 Eco-Budget 12
2.2 Outcome Based Budgeting 14
Chapter 3: Research Methodology 16
3.1 Thrissur as a Case 17
Chapter 4: Budgetary data collection 19
4.1 Primary Data Collection 19
4.2 Budgetary data analysis 19
Chapter 5: Baseline Assessment of Solid Waste Management 23
5.1 Bio – Degredable waste management 23
5.2 Non Bio – Degradable waste management 26
Chapter 6: Gap Assessment Survey 29
6.1 Identified Issues 29
Chapter 7: Conclusion 33
7.1 Current Budget for SWM sector 33
7.2 Outcome Based Budgeting 35
7.3 Future scope 36
References 38
There are no comments on this title.