Image from Google Jackets

Digital QA QC for construction projects (Softcopy is also available)

By: Contributor(s): Material type: TextTextPublication details: 2023Description: xxii,73pDDC classification:
  • B TH-1027 MIS
Contents:
TABLE OF CONTENTS ABSTRACT v UNDERTAKING vii CERTIFICATE ix ACKNOWLEDGEMENTS xi ABBREVIATIONS xiii TABLE OF CONTENTS xv LIST OF FIGURES xix LIST OF TABLES xxi CHAPTER-1: INTRODUCTION 1 1.1 Need for Study: 2 1.2 Research Objectives: 3 1.2.1 Aim: 3 1.2.2 Objective: 4 1.2.3 Scope: 4 1.3 Research Timeline: 5 CHAPTER-2: LITERATURE REVIEW 7 2.1 Cost of Quality: 7 2.2 Quality Control Plan 10 CHAPTER-3: RESEARCH METHODOLOGY 15 3.1 Literature Review: 15 3.2 Data Collection: 15 3.3 Data Analysis: 15 3.4 Data Validation: 15 CHAPTER-4: DATA COLLECTION 17 4.1 SITE – 01: Split Flyover at Pallav – Pragatinagar 17 4.1.1 Project Details: 17 4.1.2 Need of the Project 18 4.1.3 Organization Breakdown Structure: 18 4.1.4 Roles and Responsibilities: 19 4.1.5 Details Collected: 20 4.1.6 Quality Control at Site: 21 4.1.7 Quality Inspections: 25 4.1.8 Non – Conformance Reports: 26 4.1.9 Challenges in adapting DigiQC: 26 4.2 SITE – 02: The Canvas, Kavisha Group 27 4.2.1 Project Details: 27 4.2.2 Organization Breakdown Structure: 28 4.2.3 Roles and Responsibilities: 29 4.2.4 Details Collected: 29 4.2.5 Quality Control at Site: 30 4.2.6 Quality Inspections: 34 4.2.7 Non – Conformance Reports: 35 4.2.8 Challenges in adapting DigiQC: 35 4.2.9 Project Planning: 36 4.3 SITE – 03: Saanvi Nirman Stellar 38 4.3.1 Project Details: 38 4.3.2 Organization Breakdown Structure: 39 4.3.3 Roles and Responsibilities: 40 4.3.4 Details Collected: 40 4.3.5 Quality Control at Site: 41 4.3.6 Quality Inspections: 44 4.3.7 Non – Conformance Reports: 45 4.3.8 Challenges in adapting DigiQC: 45 4.3.9 Project Planning: 46 CHAPTER-5: DATA ANALYSIS 49 5.1 Summary of Existing Quality Control Process: 50 5.2 Summary of Proposed Quality Control Process: 52 CHAPTER-6: RECOMMENDATIONS 55 6.1 Problem Statement 1: 55 6.1.1 Delta: 55 6.1.2 Recommendation: 55 6.1.3 Current Approach 55 6.1.4 Proposed Approach: 56 6.1.5 Recommended Framework: 56 6.1.6 Comparative Analysis: 56 6.2 Problem Statement 2: 57 6.2.1 Delta: 57 6.2.2 Recommendation: 57 6.2.3 Current Approach 57 6.2.4 Proposed Approach: 58 6.2.5 Recommended Framework: 58 6.2.6 Comparative Analysis: 58 6.3 Problem Statement 3: 59 6.3.1 Delta: 59 6.3.2 Recommendation: 59 6.3.3 Current Approach 59 6.3.4 Proposed Approach: 59 6.3.5 Recommended Approach: 60 6.3.6 Comparative Analysis: 60 6.4 Problem Statement 4: 60 6.4.1 Delta: 61 6.4.2 Recommendation: 61 6.4.3 Solution: 61 6.4.4 Proposed Approach: 61 6.4.5 Recommended Framework: 62 CONCLUSION 63 FUTURE SCOPE 65 REFERENCES 67 APPENDIX 69
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Collection Call number Status Date due Barcode Item holds
Thesis CEPT Library Faculty of Technology B TH-1027 MIS Not For Loan 026194
Total holds: 0

TABLE OF CONTENTS
ABSTRACT v
UNDERTAKING vii
CERTIFICATE ix
ACKNOWLEDGEMENTS xi
ABBREVIATIONS xiii
TABLE OF CONTENTS xv
LIST OF FIGURES xix
LIST OF TABLES xxi
CHAPTER-1: INTRODUCTION 1
1.1 Need for Study: 2
1.2 Research Objectives: 3
1.2.1 Aim: 3
1.2.2 Objective: 4
1.2.3 Scope: 4
1.3 Research Timeline: 5
CHAPTER-2: LITERATURE REVIEW 7
2.1 Cost of Quality: 7
2.2 Quality Control Plan 10
CHAPTER-3: RESEARCH METHODOLOGY 15
3.1 Literature Review: 15
3.2 Data Collection: 15
3.3 Data Analysis: 15
3.4 Data Validation: 15
CHAPTER-4: DATA COLLECTION 17
4.1 SITE – 01: Split Flyover at Pallav – Pragatinagar 17
4.1.1 Project Details: 17
4.1.2 Need of the Project 18
4.1.3 Organization Breakdown Structure: 18
4.1.4 Roles and Responsibilities: 19
4.1.5 Details Collected: 20
4.1.6 Quality Control at Site: 21
4.1.7 Quality Inspections: 25
4.1.8 Non – Conformance Reports: 26
4.1.9 Challenges in adapting DigiQC: 26
4.2 SITE – 02: The Canvas, Kavisha Group 27
4.2.1 Project Details: 27
4.2.2 Organization Breakdown Structure: 28
4.2.3 Roles and Responsibilities: 29
4.2.4 Details Collected: 29
4.2.5 Quality Control at Site: 30
4.2.6 Quality Inspections: 34
4.2.7 Non – Conformance Reports: 35
4.2.8 Challenges in adapting DigiQC: 35
4.2.9 Project Planning: 36
4.3 SITE – 03: Saanvi Nirman Stellar 38
4.3.1 Project Details: 38
4.3.2 Organization Breakdown Structure: 39
4.3.3 Roles and Responsibilities: 40
4.3.4 Details Collected: 40
4.3.5 Quality Control at Site: 41
4.3.6 Quality Inspections: 44
4.3.7 Non – Conformance Reports: 45
4.3.8 Challenges in adapting DigiQC: 45
4.3.9 Project Planning: 46
CHAPTER-5: DATA ANALYSIS 49
5.1 Summary of Existing Quality Control Process: 50
5.2 Summary of Proposed Quality Control Process: 52
CHAPTER-6: RECOMMENDATIONS 55
6.1 Problem Statement 1: 55
6.1.1 Delta: 55
6.1.2 Recommendation: 55
6.1.3 Current Approach 55
6.1.4 Proposed Approach: 56
6.1.5 Recommended Framework: 56
6.1.6 Comparative Analysis: 56
6.2 Problem Statement 2: 57
6.2.1 Delta: 57
6.2.2 Recommendation: 57
6.2.3 Current Approach 57
6.2.4 Proposed Approach: 58
6.2.5 Recommended Framework: 58
6.2.6 Comparative Analysis: 58
6.3 Problem Statement 3: 59
6.3.1 Delta: 59
6.3.2 Recommendation: 59
6.3.3 Current Approach 59
6.3.4 Proposed Approach: 59
6.3.5 Recommended Approach: 60
6.3.6 Comparative Analysis: 60
6.4 Problem Statement 4: 60
6.4.1 Delta: 61
6.4.2 Recommendation: 61
6.4.3 Solution: 61
6.4.4 Proposed Approach: 61
6.4.5 Recommended Framework: 62
CONCLUSION 63
FUTURE SCOPE 65
REFERENCES 67
APPENDIX 69

There are no comments on this title.

to post a comment.
Excel To HTML using codebeautify.org Sheet Name :- Location Chart
Location Chart Basement 1 (B1) Class No. 600 - 649, 660 - 699
(B1) :Mezzanine 1 Class No. 700 - 728
(B1) :Mezzanine 2 Class No. 728.1 - 799, 650 - 659, Reference Books, Faculty work
Basement 2 (B2) Class No. 000 - 599, 800-999
Basement 3 (B3) (Please Inquire at the Counter for resources) Theses, Students' works, Bound Journals, Drawings, Atlas, Oversize Books, Rare Books, IS codes, Non-book Materials