Maintenance and protection of traffic (MPT) at active work zone (Softcopy is also available)
Material type: TextPublication details: 2023Description: xviii,79pDDC classification:- B TH-1003 BOD
Item type | Current library | Collection | Call number | Status | Date due | Barcode | Item holds | |
---|---|---|---|---|---|---|---|---|
Thesis | CEPT Library | Faculty of Technology | B TH-1003 BOD | Not For Loan | 026170 |
TABLE OF CONTENTS
ABSTRACT i
UNDERTAKING iii
CERTIFICATE v
ACKNOWLEDGEMENTS vii
ABBREVIATIONS ix
TABLE OF CONTENTS xi
LIST OF FIGURES xv
LIST OF TABLES xvii
CHAPTER-1: INTRODUCTION 1
1.1 Need for the Study 1
1.2 Aim 3
1.3 Objectives 3
1.4 Scope of Work 4
1.5 Timeline 4
CHAPTER-2: LITERATURE REVIEW 5
2.1 A study on the traffic impact of the road corridors due to flyover construction at Surabaya intersection, Banda Aceh of Indonesia. 5
2.2 Maintenance & Protection of Traffic at Workzone 6
2.3 Exploration of Work Zone Crash Causes and Implications for Safety Performance Measurement Programs 7
2.4 Innovation Work Zone Capacity Models from Nationwide Field and Archival Sources 8
2.5 Traffic Management near & at Work Zone 9
2.6 Tools for Road Safety Audits and Road Safety Inspections at Work Zones 10
2.7 Active Work Zone Safety: Preventing Accidents Using Intrusion Sensing Technologies 11
2.8 Summary of the Literatures: 12
CHAPTER-3: METHODOLOGY 13
CHAPTER-4: DATA COLLECTION 15
4.1 Case study 1 (Nutan Mill Road, Saraspur) 16
4.1.1 Location of Work 17
4.1.2 Layout Plan 18
4.1.3 Surrounding area zone plan 19
4.1.4 Detailed plan of project (WTMP) 20
4.1.5 Site Photograph 21
4.1.6 Description of the Photographs : 25
4.2 Case Study 2 (Vivekanand-Nagar Road, Ramol) 26
4.2.1 Location of Work 26
4.2.2 Layout Plan of Project 27
4.2.3 Measurements and Detailed Plan of Project (WTMP) 28
4.2.4 Site Photographs 29
4.2.5 Description of the Photographs : 31
4.3 Case Study 3 (Ghodasar Overfly, Narol-Naroda Road) 32
4.3.1 Location of Work 32
4.3.2 Layout Plan of Ghodasar Overfly 33
4.3.3 Surrounding area zone plan of Ghodasar Overfly 34
4.3.4 Detailed Plan of Ghodasar Overfly (WTMP) 35
4.3.5 Site Photographs 36
4.3.6 Description of the Photographs: 38
CHAPTER-5: DATA ANALYSIS 39
5.1 Rules and Responsibilities for Road Safety 39
5.1.1 Responsible Stockholders : 39
5.2 Taper Length 41
5.2.1 The elements of temporary traffic control zone are : 42
5.3 Design of Signs : 43
5.3.1 Regulatory Signs 44
5.3.2 Normal Regulatory Signs: 44
5.3.3 Application of Normal Regulatory Signs 45
5.3.4 Application of work zone regulatory signs 45
5.3.5 Application of Normal Warning Sign 45
5.4 Work Zone New Traffic Management Plan (WTMP) 46
5.4.1 Case study 1 (Nutan Mill Road, Saraspur) 46
5.4.2 Case Study 1 (WTMP Part A 47
5.4.3 Case Study 1 (WTMP Part B) 48
5.4.4 Case Study 1 (WTMP Part C) 49 xiii
5.4.5 Case study 2 (Vivekanand Nagar Road, Ramol) 50
5.4.6 Case Study 2 (WTMP Part A 51
5.4.7 Case Study 2 (WTMP Part B) 52
5.4.8 Case Study 2 (WTMP Part C) 53
5.4.9 Case Study 3 (Ghodasar Flyover, Narol-Naroda Road) 54
5.4.10 Case Study 3 (WTMP Part A) 55
5.4.11 Case Study 3 (WTMP Part B) 56
5.4.12 Case Study 3 (WTMP Part C) 57
CHAPTER-6: CONCLUSION 59
CHAPTER-7: REFERENCES 61
There are no comments on this title.