Image from Google Jackets

Critical review of Indian smart cities-Surat integrated commnad and control centre (ICCC) (Softcopy is also available)

By: Contributor(s): Material type: TextTextPublication details: 2020Description: ii,22pDDC classification:
  • MUM TH-0237 LAL
Contents:
Contents 1. Introduction 7 1.2. Significance of the project 7 1.3. Aim and Objectives 7 2. Integrated Command and Control System (ICCC) 8 2.1. Varied Components at ICCC 8 2.2. Comparative Assessment of Smart components 9 2.3. ICCC Maturity Assessment Framework 9 3. Initiatives by Indian Smart Cities through ICCC 10 3.1. City level initiatives during Covid-19 11 3.2. Data Smart Initiative 11 4. Case Studies 13 4.1. Ahmedabad ICCC 13 4.2. Vadodara ICCC 14 4.3. International Cases 15 4.3.1. Rio Operations Center, Rio De Janeiro, Brazil 15 4.3.2. Integrated Centre for Security and Emergency in Madrid 16 5. Surat ICCC 17 5.1. Surat SWM System 18 6. Stakeholder Consultation 22 6.1. Consultation Overview 22 7. Recommendations 23 7.1. Solid Waste Management (SWM) 23 7.2. Complaint Management System (CMS) 24 7.3. Intelligent Traffic Control System (ITCS) 24 Bibliography 25
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Collection Call number Status Date due Barcode Item holds
Thesis CEPT Library Faculty of Management MUM TH-0237 LAL Not For Loan 023944
Total holds: 0

Contents
1. Introduction 7
1.2. Significance of the project 7
1.3. Aim and Objectives 7
2. Integrated Command and Control System (ICCC) 8
2.1. Varied Components at ICCC 8
2.2. Comparative Assessment of Smart components 9
2.3. ICCC Maturity Assessment Framework 9
3. Initiatives by Indian Smart Cities through ICCC 10
3.1. City level initiatives during Covid-19 11
3.2. Data Smart Initiative 11
4. Case Studies 13
4.1. Ahmedabad ICCC 13
4.2. Vadodara ICCC 14
4.3. International Cases 15
4.3.1. Rio Operations Center, Rio De Janeiro, Brazil 15
4.3.2. Integrated Centre for Security and Emergency in Madrid 16
5. Surat ICCC 17
5.1. Surat SWM System 18
6. Stakeholder Consultation 22
6.1. Consultation Overview 22
7. Recommendations 23
7.1. Solid Waste Management (SWM) 23
7.2. Complaint Management System (CMS) 24
7.3. Intelligent Traffic Control System (ITCS) 24
Bibliography 25


There are no comments on this title.

to post a comment.
Excel To HTML using codebeautify.org Sheet Name :- Location Chart
Location Chart Basement 1 (B1) Class No. 600 - 649, 660 - 699
(B1) :Mezzanine 1 Class No. 700 - 728
(B1) :Mezzanine 2 Class No. 728.1 - 799, 650 - 659, Reference Books, Faculty work
Basement 2 (B2) Class No. 000 - 599, 800-999
Basement 3 (B3) (Please Inquire at the Counter for resources) Theses, Students' works, Bound Journals, Drawings, Atlas, Oversize Books, Rare Books, IS codes, Non-book Materials