Image from Google Jackets

Application of set-based design to investigate value generation in greenfield indian construction projects (Softcopy is also available)

By: Contributor(s): Material type: TextTextPublication details: 2021Description: xix,141pDDC classification:
  • CEM TH-0395 SHA
Contents:
TABLE OF CONTENTS ABSTRACT i UNDERTAKING iii CERTIFICATE v ACKNOWLEDGEMENTS vii NOMENCLATURE x LIST OF FIGURES xvii LIST OF TABLES xix CHAPTER-1: INTRODUCTION 2 1.1 Need for the study 2 1.2 Objectives 4 1.3 Scope of the work 4 1.4 Methodology 4 1.5 Timeline of activities 6 1.6 Contribution 6 CHAPTER-2: LITERATURE REVIEW 8 2.1 The construction design process 8 2.2 Construction design life-cycle 9 2.3 Design management 12 2.2.1 Challenges in design management and its implementation 13 2.3 Lean in Design Management 15 2.4 Waste in Design process due to Point-based design 17 2.5 Set-Based Design 19 2.5.1 Current Application of SBD in AEC industry 20 2.6 Research gaps 22 CHAPTER-3: RESEARCH METHODOLOGY 24 3.1 What is Action Research 24 3.2 Why Action Research 25 3.3 Cyclic Stages of Action Research Methodology adopted 26 3.3.1 Establishing Research Environment 27 3.3.2 Diagnosing 29 3.3.3 Action Planning 29 3.3.4 Action Taking 29 3.3.5 Evaluating 30 3.3.6 Specifying Learning 30 3.4 Framework adopted for the current research 30 3.5 Summary of the adopted research methodology 33 CHAPTER-4: DATA COLLECTION 36 4.1 Diagnosing 36 4.1.1 Semi-Structured Interviews with the Project stakeholders 36 4.1.2 Semi-Structured Interviews with the other Design Experts 40 4.2 Action Planning 43 4.2.1 Project – I (M/s Hilux Auto-electric Pvt. Ltd.) Studio line design 43 4.2.2 Project – II (M/S HERO E-Cycles Pvt. Ltd.) Studio line design 45 4.2.3 Project – III (Residence at N-246, Greater Kailash-I) Design Consortia 47 4.3 Action Taking 49 4.3.1 Project – I (M/s Hilux Auto-electric Pvt. Ltd.) Studio line design 50 4.3.2 Project – II (M/S HERO E-Cycles Pvt. Ltd.) Studio line design 54 4.3.3 Project – III (Residence at N-246, Greater Kailash-I) Design Consortia 59 CHAPTER-5: DATA ANALYSIS 64 Evaluation 64 5.1.1 Data Analysis of the Semi-Structured Interviews using Thematic analysis 64 5.1.2 Evaluation of SBD implementation in organizational settings 73 5.2 Specifying Learnings 76 5.2.1 Learnings about Success and Advantage of SBD implementation 76 5.2.2 Learnings of Challenges faced in SBD implementation 77 5.2.3 SBD implementation Framework for Construction Projects 77 CHAPTER-6: CONCLUSION 80 6.1 Achievement of Research Objectives 80 6.2 Research Limitations 81 6.3 Future Scope of work 82 REFERENCES 84 APPENDIX 94 Appendix-I: Transcripts of Semi-structured Interviews with Project Stakeholders 94 1. Interview with Architectural design consultant – Studio Line Design Pvt. Ltd. 94 2. Interview with Architectural design consultant – Design Consortia 98 3. Interview with Structural consultant – Beniwal Associates Pvt. Ltd. 101 Appendix-II: Transcripts of Semi-structured Interviews with DESIGN EXPERTS 103 1. Interview with Design Expert – Loughborough University 103 2. Interview with Design Expert – Texan A&M University 107 3. Interview with Design Expert – GMR-DIAL 113 4. Interview with Design Expert – Colliers International 119 5. Interview with Design Expert – Crisil 124 Appendix-III: Thematic analysis output 132 Thematic analysis theme-1 (Challenges of point-based design) 132 Thematic analysis theme-2 (Value propositions) 133 Thematic analysis theme-3 (Challenges of implementing sbd) 135 Thematic analysis theme-4 (Overview and advantages of sbd) 136 Thematic analysis theme-5 (Tools to facilitate SBD) 138 Thematic analysis theme-6 (BIM-SBD integration) 139 Thematic analysis theme-7 (Project type for SBD implementation) 139 Thematic analysis theme-8 (Design trade) 140 Thematic analysis theme-9 (Stakeholders that drive SBD) 141 Thematic analysis theme-10 (Design stages followed by Indian firms) 141
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Collection Call number Status Date due Barcode Item holds
Thesis CEPT Library Faculty of Technology CEM TH-0395 SHA Not For Loan 023580
Total holds: 0

TABLE OF CONTENTS
ABSTRACT i
UNDERTAKING iii
CERTIFICATE v
ACKNOWLEDGEMENTS vii
NOMENCLATURE x
LIST OF FIGURES xvii
LIST OF TABLES xix
CHAPTER-1: INTRODUCTION 2
1.1 Need for the study 2
1.2 Objectives 4
1.3 Scope of the work 4
1.4 Methodology 4
1.5 Timeline of activities 6
1.6 Contribution 6
CHAPTER-2: LITERATURE REVIEW 8
2.1 The construction design process 8
2.2 Construction design life-cycle 9
2.3 Design management 12
2.2.1 Challenges in design management and its implementation 13
2.3 Lean in Design Management 15
2.4 Waste in Design process due to Point-based design 17
2.5 Set-Based Design 19
2.5.1 Current Application of SBD in AEC industry 20
2.6 Research gaps 22
CHAPTER-3: RESEARCH METHODOLOGY 24
3.1 What is Action Research 24
3.2 Why Action Research 25
3.3 Cyclic Stages of Action Research Methodology adopted 26
3.3.1 Establishing Research Environment 27
3.3.2 Diagnosing 29
3.3.3 Action Planning 29
3.3.4 Action Taking 29
3.3.5 Evaluating 30
3.3.6 Specifying Learning 30
3.4 Framework adopted for the current research 30
3.5 Summary of the adopted research methodology 33
CHAPTER-4: DATA COLLECTION 36
4.1 Diagnosing 36
4.1.1 Semi-Structured Interviews with the Project stakeholders 36
4.1.2 Semi-Structured Interviews with the other Design Experts 40
4.2 Action Planning 43
4.2.1 Project – I (M/s Hilux Auto-electric Pvt. Ltd.) Studio line design 43
4.2.2 Project – II (M/S HERO E-Cycles Pvt. Ltd.) Studio line design 45
4.2.3 Project – III (Residence at N-246, Greater Kailash-I) Design Consortia 47
4.3 Action Taking 49
4.3.1 Project – I (M/s Hilux Auto-electric Pvt. Ltd.) Studio line design 50
4.3.2 Project – II (M/S HERO E-Cycles Pvt. Ltd.) Studio line design 54
4.3.3 Project – III (Residence at N-246, Greater Kailash-I) Design Consortia 59
CHAPTER-5: DATA ANALYSIS 64 Evaluation 64
5.1.1 Data Analysis of the Semi-Structured Interviews using Thematic analysis 64
5.1.2 Evaluation of SBD implementation in organizational settings 73
5.2 Specifying Learnings 76
5.2.1 Learnings about Success and Advantage of SBD implementation 76
5.2.2 Learnings of Challenges faced in SBD implementation 77
5.2.3 SBD implementation Framework for Construction Projects 77
CHAPTER-6: CONCLUSION 80
6.1 Achievement of Research Objectives 80
6.2 Research Limitations 81
6.3 Future Scope of work 82
REFERENCES 84
APPENDIX 94
Appendix-I: Transcripts of Semi-structured Interviews with Project Stakeholders 94
1. Interview with Architectural design consultant – Studio Line Design Pvt. Ltd. 94
2. Interview with Architectural design consultant – Design Consortia 98
3. Interview with Structural consultant – Beniwal Associates Pvt. Ltd. 101
Appendix-II: Transcripts of Semi-structured Interviews with DESIGN EXPERTS 103
1. Interview with Design Expert – Loughborough University 103
2. Interview with Design Expert – Texan A&M University 107
3. Interview with Design Expert – GMR-DIAL 113
4. Interview with Design Expert – Colliers International 119
5. Interview with Design Expert – Crisil 124
Appendix-III: Thematic analysis output 132
Thematic analysis theme-1 (Challenges of point-based design) 132
Thematic analysis theme-2 (Value propositions) 133
Thematic analysis theme-3 (Challenges of implementing sbd) 135
Thematic analysis theme-4 (Overview and advantages of sbd) 136
Thematic analysis theme-5 (Tools to facilitate SBD) 138
Thematic analysis theme-6 (BIM-SBD integration) 139
Thematic analysis theme-7 (Project type for SBD implementation) 139
Thematic analysis theme-8 (Design trade) 140
Thematic analysis theme-9 (Stakeholders that drive SBD) 141
Thematic analysis theme-10 (Design stages followed by Indian firms) 141

There are no comments on this title.

to post a comment.
Excel To HTML using codebeautify.org Sheet Name :- Location Chart
Location Chart Basement 1 (B1) Class No. 600 - 649, 660 - 699
(B1) :Mezzanine 1 Class No. 700 - 728
(B1) :Mezzanine 2 Class No. 728.1 - 799, 650 - 659, Reference Books, Faculty work
Basement 2 (B2) Class No. 000 - 599, 800-999
Basement 3 (B3) (Please Inquire at the Counter for resources) Theses, Students' works, Bound Journals, Drawings, Atlas, Oversize Books, Rare Books, IS codes, Non-book Materials