Image from Google Jackets

Construction close-out strategys for real estate developers (Soft copy is also available)

By: Contributor(s): Material type: TextTextDescription: vii,70pDDC classification:
  • CPM TH-0375 GAJ
Contents:
Contents Chapter 1: Proposal I 1.1 Introduction 1.2 Need for Study 4 1.3 Objective. 5 1.4 Scope 5 1.6 Research Plan 5 Chapter 2: Literature Review . 6 2.1 Introduction 6 2.2 What is Project Closeout? 6 2.3 Types of Closeout Approach 7 2.4 Importance of Project Closeout. 9 2.5 Factors affecting cbseout 11 2.6 What are Real Estate Project Success Factors? 16 2.7 Factors critical for Project Success 18 2.8 Factors affecting Project Handover 20 2.9 Construction Delays and Their Causative Factors 23 2.10 Research gap 26 Chapter 3: Data Collection 27 3 .1 Introduction 27 • 3 .2 Pilot Survey 28 3.3 Structure of Questionnaire 28 3.4 Data Collection 29 3.5 Data Compilation 29 Chapter 4: Data Analysis 30 4.1 Respondents Characteristics 30 4.2 Respondents Attitude on Proj ect Closeout 33 4.3 Construction Scheduling 33 4.4 Statistical Analysis 36 4.5 Data Reliability 45 Chapter 5: Framework. 47 5 .1 Introduction 4 7 5.2 Importance ofBSC Framework 47 5.3 Methodology adopted 48 5 .4 Testing the performance of framework 51 5.5 Validity Test Findings 53 Chapter 6: Summary 54 6. l Summary of Factors in Delays 54 6.2 Future Scope 55 References Appendix 1 Appendix 2
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Collection Call number Status Date due Barcode Item holds
Thesis CEPT Library Faculty of Technology CPM TH-0375 GAJ Not for loan 022588
Total holds: 0

Contents
Chapter 1: Proposal I
1.1 Introduction
1.2 Need for Study 4
1.3 Objective. 5
1.4 Scope 5
1.6 Research Plan 5
Chapter 2: Literature Review . 6
2.1 Introduction 6
2.2 What is Project Closeout? 6
2.3 Types of Closeout Approach 7
2.4 Importance of Project Closeout. 9
2.5 Factors affecting cbseout 11
2.6 What are Real Estate Project Success Factors? 16
2.7 Factors critical for Project Success 18
2.8 Factors affecting Project Handover 20
2.9 Construction Delays and Their Causative Factors 23
2.10 Research gap 26
Chapter 3: Data Collection 27
3 .1 Introduction 27
• 3 .2 Pilot Survey 28
3.3 Structure of Questionnaire 28
3.4 Data Collection 29
3.5 Data Compilation 29
Chapter 4: Data Analysis 30
4.1 Respondents Characteristics 30
4.2 Respondents Attitude on Proj ect Closeout 33
4.3 Construction Scheduling 33
4.4 Statistical Analysis 36
4.5 Data Reliability 45
Chapter 5: Framework. 47
5 .1 Introduction 4 7
5.2 Importance ofBSC Framework 47
5.3 Methodology adopted 48
5 .4 Testing the performance of framework 51
5.5 Validity Test Findings 53
Chapter 6: Summary 54
6. l Summary of Factors in Delays 54
6.2 Future Scope 55
References
Appendix 1
Appendix 2

There are no comments on this title.

to post a comment.
Excel To HTML using codebeautify.org Sheet Name :- Location Chart
Location Chart Basement 1 (B1) Class No. 600 - 649, 660 - 699
(B1) :Mezzanine 1 Class No. 700 - 728
(B1) :Mezzanine 2 Class No. 728.1 - 799, 650 - 659, Reference Books, Faculty work
Basement 2 (B2) Class No. 000 - 599, 800-999
Basement 3 (B3) (Please Inquire at the Counter for resources) Theses, Students' works, Bound Journals, Drawings, Atlas, Oversize Books, Rare Books, IS codes, Non-book Materials