Image from Google Jackets

Reviewing the impact of governance on the pre-implementation process of smart cities mission, India (Softcopy is also available)

By: Contributor(s): Material type: TextTextPublication details: 2020Description: vii,6,xi-xx,75,xxi-xxixpDDC classification:
  • P TH-2430 BAH
Contents:
Contents Undertaking iii Certificate v Acknowledgements vii Abstract ix Table of contents . xi List of figures xv List of tables xvii Abbreviations xix 1 INTRODUCTION 1 1.1 Background 1 1.1.1 The Trajectory of India’s Urban Policy Development 1 1.2 The idea of an Indian Smart Cities 3 1.2.1 The ‘Loose Fit, Light Touch’ Framework 5 1.3 Collateral Study 5 1.3.1 Smart cities concept globally 5 1.3.2 Smart cities as a metaphor for urban modernity 6 1.3.3 Smart cities prophecy by developed and developing nations 6 1.3.4 Indian Smart Cities Mission Implementation mechanism . 7 1.3.5 Problem statement 8 1.4 Research question 8 1.5 Aim & Objective 9 1.6 Scope & Limitations 9 1.7 Research Framework 9 1.8 Methodology 11 2 DECODING THE INDIAN SMART CITY MISSION GUIDELINE13 2.1 SCAP 1: Conceptualising Smart Cities for India 14 2.2 SCAP 2: Pilot City Selection 16 2.2.1 Process of selection of Smart Cities 17 2.2.2 Sample city selection for study 19 2.3 SCAP 3: Smart Cities Plan 19 2.4 SCAP 4: Project Identification by the cities 22 2.5 SCAP 5: Implementation of plans & projects 24 2.6 SCAP 6: Monitoring & Evaluation 24 3 PRE-IMPLEMENTATION PROCESS 25 3.1 Defining Pre-implementation 25 3.2 Assessment matrices making 27 3.3 Project Formulation Stage 28 3.3.1 Assessment Matrices 28 3.3.2 Key Observations: 30 3.4 Project Finance estimation 32 3.4.1 Assessment Matrices 32 3.4.2 Key Observations 35 3.5 Project Governance 37 3.5.1 Assessment Matrices 37 3.5.2 Key Observations 39 3.5.3 Way Forward 39 4 GOVERNANCE STRUCTURE FOR IMPLEMENTATION 40 4.1 Urban Governance . 40 4.2 The rationale of Special Purpose Vehicles for implementation . 41 4.2.1 Special Purpose Vehicles 41 4.2.2 SPV under Smart Cities Mission 42 4.3 Actor-Network Theory 49 4.3.1 ANT 1: Urban governance for policy implementation before the Smart Cities Mission 49 4.3.2 ANT 2: Urban governance for policy implementation in the Smart Cities Mission 50 4.4 SPV Organisation 54 4.4.1 Pune, Maharashtra. 54 4.4.2 Indore, Madhya Pradesh 58 4.4.3 Udaipur, Rajasthan 61 4.4.4 Comparative Analysis & Observations 63 5 DRIVING THE CHANGE 64 5.1 Recommendations 66 5.1.1 Governance Structure for implementation 66 5.1.2 Pre-implementation process 69 5.2 Conclusion 70 Interviewees 71 References 72 Appendix 1: Assessment Matrices data source xxi Appendix 2: Questionnaire sample & Discussion highlights xxii
List(s) this item appears in: Trajectory of CEPT University
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Collection Call number Status Date due Barcode Item holds
Thesis CEPT Library Faculty of Planning P TH-2430 BAH Not for loan 022880
Total holds: 0

Contents
Undertaking iii
Certificate v
Acknowledgements vii
Abstract ix
Table of contents . xi
List of figures xv
List of tables xvii
Abbreviations xix
1 INTRODUCTION 1
1.1 Background 1
1.1.1 The Trajectory of India’s Urban Policy Development 1
1.2 The idea of an Indian Smart Cities 3
1.2.1 The ‘Loose Fit, Light Touch’ Framework 5
1.3 Collateral Study 5
1.3.1 Smart cities concept globally 5
1.3.2 Smart cities as a metaphor for urban modernity 6
1.3.3 Smart cities prophecy by developed and developing nations 6
1.3.4 Indian Smart Cities Mission Implementation mechanism . 7
1.3.5 Problem statement 8
1.4 Research question 8
1.5 Aim & Objective 9
1.6 Scope & Limitations 9
1.7 Research Framework 9
1.8 Methodology 11
2 DECODING THE INDIAN SMART CITY MISSION GUIDELINE13
2.1 SCAP 1: Conceptualising Smart Cities for India 14
2.2 SCAP 2: Pilot City Selection 16
2.2.1 Process of selection of Smart Cities 17
2.2.2 Sample city selection for study 19
2.3 SCAP 3: Smart Cities Plan 19
2.4 SCAP 4: Project Identification by the cities 22
2.5 SCAP 5: Implementation of plans & projects 24
2.6 SCAP 6: Monitoring & Evaluation 24
3 PRE-IMPLEMENTATION PROCESS 25
3.1 Defining Pre-implementation 25
3.2 Assessment matrices making 27
3.3 Project Formulation Stage 28
3.3.1 Assessment Matrices 28
3.3.2 Key Observations: 30
3.4 Project Finance estimation 32
3.4.1 Assessment Matrices 32
3.4.2 Key Observations 35
3.5 Project Governance 37
3.5.1 Assessment Matrices 37
3.5.2 Key Observations 39
3.5.3 Way Forward 39
4 GOVERNANCE STRUCTURE FOR IMPLEMENTATION 40
4.1 Urban Governance . 40
4.2 The rationale of Special Purpose Vehicles for implementation . 41
4.2.1 Special Purpose Vehicles 41
4.2.2 SPV under Smart Cities Mission 42
4.3 Actor-Network Theory 49
4.3.1 ANT 1: Urban governance for policy implementation before the
Smart Cities Mission 49
4.3.2 ANT 2: Urban governance for policy implementation in the Smart
Cities Mission 50
4.4 SPV Organisation 54
4.4.1 Pune, Maharashtra. 54
4.4.2 Indore, Madhya Pradesh 58
4.4.3 Udaipur, Rajasthan 61
4.4.4 Comparative Analysis & Observations 63
5 DRIVING THE CHANGE 64
5.1 Recommendations 66
5.1.1 Governance Structure for implementation 66
5.1.2 Pre-implementation process 69
5.2 Conclusion 70
Interviewees 71
References 72
Appendix 1: Assessment Matrices data source xxi
Appendix 2: Questionnaire sample & Discussion highlights xxii

There are no comments on this title.

to post a comment.
Excel To HTML using codebeautify.org Sheet Name :- Location Chart
Location Chart Basement 1 (B1) Class No. 600 - 649, 660 - 699
(B1) :Mezzanine 1 Class No. 700 - 728
(B1) :Mezzanine 2 Class No. 728.1 - 799, 650 - 659, Reference Books, Faculty work
Basement 2 (B2) Class No. 000 - 599, 800-999
Basement 3 (B3) (Please Inquire at the Counter for resources) Theses, Students' works, Bound Journals, Drawings, Atlas, Oversize Books, Rare Books, IS codes, Non-book Materials